CDT Practice Exam | 100% Correct Answers | Verified | Latest 2024 Version
The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: - conditions of the contract General Requirements are part of: - Specifications The three essential considerations in the evaluation of a product are - Requirements, Criteria, and Tests Whose responsibility is it to furnish the Shop Drawings - The Contractor The division of the Work among multiple prime Contracts is described in: a) Instructions to Bidders. b) Supplementary Conditions. c) Division 01. d) Special Conditions. - c) Division 01. During the Project Conception Stage, the A/E may be retained to: a) Develop outline specifications b) Describe the character of the mechanical system c) Prepare renderings d) Assist in financial feasibility studies - d) Assist in financial feasibility studies The person who becomes secondarily liable for another's debt or performance is called the: a) Guarantee b) Warrantor c) Guarantor
Written for
- Institution
- CDT
- Course
- CDT
Document information
- Uploaded on
- March 15, 2024
- Number of pages
- 13
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cdt practice exam 100 correct answers verifie
Also available in package deal