California UST Service Technician part 1 Verified solution Rated A
California UST Service Technician part 1 Verified solution Rated A July 1 2005, service techs shall possess or work under someone who has a current certification indicating he or she has passed the ? California UST service technician exam ICC cert must be renewed every? 24 months Service techs must posses or be employed by a person who has the appropriate contractors license unless? The individual has a Tank testing licens Service tech is defined by any individual who? Test UST monitoring equipment Trouble shoots UST systems Installs UST monitoring equipment If the manufacturer training no longer exist , the local angency may? Approve comparable alternat training . UST includes? Tank and connected piping What is considered and UST petroleum storage tank What UST system meets the requirements for secondary containment? Doubled wall tanks According to title 23; the following piping components if installed after July 1 1987 must have secondary containment Pressured product piping Considered "pipe" on tanks installed after July 1 2003 Pressured product piping and below ground vapor recovery Under dispenser containment (UDC) was required for all UST systems by December 31 2003 System for exchanging gas vapors in a storage tank and product in a fuel delivery truck Stage 1 vapor recovery An approved method for non visual monitoring for existing UST systems. Statistical Inventory Reconciliation (SIR) ATG must be capable for detecting a release of ? .2 gallons per hour Manual inventory reconciliation. No longer an approved method for non visual monitoring on existing UST systems Automatic line leak detectors installed on underground piping with secondary containment shall be capable of tetecting a leak of ? 3 gallons per hour at 10 psi ATG should be programmed to test the tank ? At least monthly According to PEI RP 300 a combustible gas can be used to ? Detect vapor leaks in a vapor recovery system. According to PEI RP 300. A written scope of work for vapor recovery installation should include? Construction plans Positive shut off overfill protection device must stop the flow of fuel when the tank is no more then ? 95% full According to EO VR 201 A What could cause a nozzle shut off mechanism or malfunction? Depended filter seal damage According to VR 201 A Breakaway reconnection must be ? Logged in GDF log According to PEI RP 300 the following method of documenting piping location is NOT to ? Sketch a diagram on the inside cover of vapor recovery equipment manual According to PEI RP 300 as built drawing or pictures of the underground pipping and other components shall be ? Maintained as long as UST is in service According to EO VR 101 E maintance records are required to include? Name and designated UST operator . The Phil-Tite EVR phase 1 system require that vapor vent pipes at any UST system be Used with no more then 3 p/v valves According to EO VR 2010 after installing a new spout assembly in the Healy 900 nozzle the following test must be conducted ? Nozzle dispensing shut off test According to Healy EO VR 201 A a vapor recovery record are to be maintained by? Gasoline dispensing facility operator (GDF) how many feet within a public drinking well require an enhanced leak detection test 1000 feet What are the components of the Fire Triangle ? Fuel Ignition source oxygen If equipped with an over fill alarm, it must be located? So it can be seen or heard from the delivery location. UDC was required at time of installation for all systems installed after? Januarary 1 2000 If installed, the following requires independent 3rd party certification to prove compliance with established regulations. Automatic Tank Gauge Liquid Product Detectors SIR Where are ATG's installed ? Opening in top of the tank What is true about ATG's They're capable of alarming operator of low product level The following types of releases must be reported to the local Agency. Releases greater than 25 gallons that escape secondary containment. Release that escape primary containment. Releases less then 25 gallons which escape secondary containment If an unauthorized product release meets the requirements for reporting to the local agency, verbal notification must be made within ____hours, followed by a written notification within ____days. 24, 5 The following unusual conditions shall be reported to the local agency, EXCEPT: Water in spill buckets
Written for
- Institution
- California ICC
- Course
- California ICC
Document information
- Uploaded on
- March 13, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
california ust service technician part 1 verified
Also available in package deal