100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACARB MOCK EXAM – PCM QUESTIONS WITH CORRECT ANSWERS

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
10-03-2024
Written in
2023/2024

An architecture firm is facing a deadline on a large library project and decides to hire a freelance computer-aided design (CAD) drafter who works from home to assist the firm in completing the construction documents on time. According to the National Council of Architectural Registration Boards (NCARB) RULES OF CONDUCT, what must the architect of record do to sign and seal the final drawings? A. The architect must redline the drawings and have the drafter make the appropriate corrections B. The architect must review and correct the work after it is prepared by the drafter and incorporate it into the construction documents C. The architect must thoroughly examine the drawings prepared by the drafter and incorporate the work into the construction documents. The firm must also retain documentation of communications with the drafter throughout the drafter's involvement with the project and must keep records of the arch - Answer-C Which types of business organization limit an individual's liability to the amount that an individual has invested in the company? Choose 3. A. partnership B. corporation C. joint venture D. limited liability company E. limited liability partnership F. disadvantaged business enterprise - Answer-B D E Which of the following are required to prove negligence? Choose 4. A. agency B. breach C. cause D. commission E. damage F. duty - Answer-B C E F An architect writes a specification for floor tile for a public restroom, which states that the tile is to be "American Tile Company 12 x 12 porcelain floor tile, Pattern 463 Oceania, Color 42 Sandstorm or approved equal". The contractor contacts a local tile supplier and discovers that this product has a 12-weel lead time, but it will be necessary to have the tile on site earlier to stay within the project schedule. If the contractor wishes to propose a different tile, when must that request to the architect be submitted?

Show more Read less
Institution
NCARB - National Council Of Architectural Registration Boards Certified
Course
NCARB - National Council of Architectural Registration Boards Certified










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NCARB - National Council of Architectural Registration Boards Certified
Course
NCARB - National Council of Architectural Registration Boards Certified

Document information

Uploaded on
March 10, 2024
Number of pages
16
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
lectknancy Boston University
View profile
Follow You need to be logged in order to follow users or courses
Sold
284
Member since
2 year
Number of followers
28
Documents
26008
Last sold
5 days ago

3.6

57 reviews

5
23
4
10
3
11
2
3
1
10

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions