Nascla and GENERAL CONTRACTOR A Exam Questions with 100% Correct Answers In built up roofs, cant strips shall extend how many inches up the vertical surface? - answer5" Air entertainment should always be specified for concrete exposed to what? - answerFreezing and thawing In a post tensioning environment, when a two-stroke pull is required, the final pull should be pre-calculated to use no more than what percentage of the full stroke of the jack on the final pull? - answer60% Tack or spot welding can reduce the strength of a bar to what percent of its original capacity? - answer35 - 40 % The advantage of nuclear compaction testing is? - answerYou do not have to remove the soil from the site how many gallons of flammable liquids shall be stored in a room outside of an approved storage cabinet? - answer25 A ______ bond will ensure the contractor that wins the project will draw up and put into action the contract at the bid price and submit performance and payment bonds. - answerBid A ______ bond promises that the contract will stay within the bounds of the contract until completion. - answerPerformance A bond that ensures the subcontractors and suppliers for a specific project will get paid and will liens from being enforced on said project. - answerLabor and Material Payment _______ ______ Insurance will safeguard the contractor just in case there is devastation or loss to a project before completion. - answerBuilders Risk ________ ________ will keep the claim amount from being more than the dollar amount covered by regular general liability or vehicle insurance. - answerUmbrella Liability Name one of the persons responsible for creating a estimate for a job. - answerProject Manager, Superintendent The part of a project, when creating a estimate, that is the toughest to plan for is the _____ _______. - answerlabor productivity The percentage of lumber used for framing that is typically wasted is ______. - answer10% Name one of the fundamental types of scheduling. - answerBar Chart, Network Diagram, Critical Path Schedule A _____ will show all of the activities that have to be completed in order for a project to be finished. - answerWBS, Work Breakdown Structure When working on a project there are certain things that must be done but are not on a deadline to complete, meaning it has a flexible schedule. What term would describe that flexibility? - answerfloat time A _____ ______ contract will allow the Owner a choice to reimburse the contractor when supplies are utilized within the scope of the project instead of when they are on the property. - answerFixed Price Just In Time delivery has a couple of benefits, name one of them - answerReduces risk of loss, prevents job site congestion Submitting that are to be provided in the last design phase include: (mark the best answer) - answercharts, drawings, samples, all of the above An FOB (Free On Board) Job Site increases the contractor's liability of supplies being lost or damaged. - answerFalse A ______ _____will keep track of the submittal process to anyone associated with the project, such as subcontractors or orders for materials. - answerExpediting Log A _____ ______ will keep track of a submittal and number each one of them. - answersubmittal register A _____ _____ payment is figured in such a way that could sometimes cause an overage of the amount actually due on the contract terms. - answerLump Sum A ________ ,agreed upon in the contract, will be withheld from the amount billed to ensure the project will be completed before it is released. - answerRetention A ______ lien release will release all rights to place liens on a project and any money that was due has been secured. - answerunconditional A _______ lien release is usually given when a payment request is made and hinges upon payment being received for goods furnished. - answerConditional A Change Order must be signed by three different people once the project has been awarded, which will change certain parts in the scope of the job. Name one of the people that has to sign that order. - answerowner, contractor, architect If you can not settle a dispute between two people, usually ________ occurs which will take up a lot of time and is a costly way of resolution. - answerlitigation A dispute that is heard by someone not associated with either of the parties involved to assist with coming to an agreement is an example of _________. - answermediation When someone not associated with a dispute is given the authority to make a decision on what to do to get the problem settled, also known as a formal option to a lawsuit, it is called ________. - answerarbitration Name one of the biggest parts of a project that have to be checked off during Close-out. - answerDemobilizing, Obtaining certificate of completion, Obtaining certificate of occupancy, Making sure tasks match the contract The _______ lets the owner know that a punch list has been finished. - answerarchitect A ________ awards the certificate of substantial completion. - answerarchitect The inspection by the ______ _______ is the greatest part of obtaining the certificate of occupancy. - answerFire Marshall According to AIA Document G704-2000 the acceptable meaning of Substantial Completion is that the project had enough work finished in order for the owner to inhabit or use the completed project as intended. - answerTrue The _______ ________ is responsible for making sure the owner and subcontractors have closed out all financial aspects of the project. - answerProject Manager Name one of the people in charge of marking up As-built drawings. - answerAssistant Superintendent, Foreman A Final Lien Release shows that all financial aspects of the project have been taken care of and that there will be no liens placed on the finished project. - answerTrue An __________ is a describable action that leads to accomplishing the project which usually includes completing the project within the scope of time identified in the contract and within the budget. - answerobjective ______ _______ is a way to display the output and timeliness of the project as well as efficiency running it. - answerCost Control

Show more Read less
Institution
NASCLA
Course
NASCLA









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NASCLA
Course
NASCLA

Document information

Uploaded on
March 9, 2024
Number of pages
12
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
595
Member since
1 year
Number of followers
178
Documents
23585
Last sold
9 hours ago
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

119 reviews

5
56
4
21
3
21
2
4
1
17

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions