Three-point estimate Correct Answer-(most likely estimate + optimistic estimate + pessimistic estimate)/3 = (40 + 24 + 65)/3 = 43 hours formula for SV (schedule variance) Correct Answer-SV = EV - PV project scope documents Correct Answer-product description, key deliverables, success and acceptance criteria, key performance indicators, exclusions, assumptions, and constraints scope statement Correct Answer-The scope statement is used as a baseline for future project decisions. The scope statement includes the project objectives, a project description, acceptance criteria, key deliverables, success criteria, exclusions from scope, time and cost estimates, project assumptions, and constraints. PMBOK Guide knowledge areas Correct Answer-Scope, Time, Cost, Quality, Human Resources, Communications, Risk, Procurement, Integration, and Stakeholder. The cost performance index (CPI) is calculated as: Correct Answer-CPI=EV /AC - When putting the values as EV = $8,500 and AC = $5,000 $8, 500 / $5, 000 = 1.7
Written for
- Institution
- CompTIA
- Course
- CompTIA
Document information
- Uploaded on
- March 8, 2024
- Number of pages
- 21
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
wgu c176 comptia project questions with correct a
Also available in package deal