Journeyman Plumbing Test Study Guide With Latest Solutions
Journeyman Plumbing Test Study Guide With Latest Solutions more restrictive provisions apply - answerwhere conflicts occur between code and manufacture instructions. what shall be 3rd party certified as conforming to NSF 14 - answerall plastic pipe, fittings and components. all strainer plates on drain inlets shall be designed and installed so that all openings are..? - answernot greater than 1/2 inch (12.7) in least dimension. pipes through foundation walls need..? - answera relieving arch or a pipe sleeve which is 2 pipe sized bigger. waterproofing joints at the roof and around vent pipes shall be made water tight by use of....? - answerlead, copper, steel, aluminum, plastic, or approved flashing/flashing material. exterior wall opening must be made...? - answerwater tight. T or F: buried piping needs to be supported throughout it entire length. - answerTrue When backfilling the trench, that was over excavated - answerbackfill up to installation level of bottom of pipe w/sand or gravel in layers no more than 6" in depth and compacted after each placement. when a rock is encountered trenching - answerremoved to not less than 3 inches below installation level. backfill with tamped sand. when backfilling pipe systems crown of the pipe must be covered by...? - answer12 inches of tamped earth. T or F: truss members and components may be cut, drilled, notched or spliced. - answerfalse. unless they obtain approval from a design professional. hanger spacing: steel pipe - answerevery 12 ft horizontal 15 vertical where hot water piping is bundled w/cold or hot water piping... - answereach hot water pipe shall be insulated. pipe sizes great than 4 inch need restraints for drain pipes at.. - answerall changes in direction and changes in diameter greater that 2 pipe sizes. testing gauge required for 10 psi or less? - answerhas increments of .10psi or less. testing gauge required for >10 psi up to 100 psi - answerincrements of 1 psi testing gauge required for greater than 100 psi - answerincrements of 2 psi tests shall last not less than..? - answer15 minutes 2 ways you can test a drainage system. - answerin its entirety or in sections. if testing entire drainage system, all openings in piping shall be tightly closed except..? - answerthe highest opening, and system shall be filled to point of overflowing. if drainage system is tested in sections, no section shall be tested with less than..? - answera 10 foot head of water. T or F: plastic piping shall not be tested using air. - answertrue. when testing drainage system w/air, force air into system until there is... - answera uniform pressure of 5 psi or sufficient to balance a 10 inch colum of mercury. (no air test on plastic piping ) drainage and vent final test shall be... - answervisual (smoke) gravity sewer test consists of plugging building sewer at point of connection w/ public sewer, filling building sewer with water testing with not less than... - answer10 foot head of water. maintain for 15 minutes. shower liner test. fill with water not less than... - answer2 inches measured at threshold. hanger spacing: lead pipe - answercontinuous horizontal, 4 feet vertical liquid combustion byproducts of condensing appliances shall be collected and discharged to... - answeran approved plumbing fixture or disposal area in accordance with manufacturer's instructions. appliances containing evaporator or cooling coils must be provided with... - answercondensate drain systems. condensate disposal piping shall maintain a horizontal slope in the direction of discharge not less than - answer1/8 unit vertical in 12 units horizontal (1 percent slope) sheet copper for general applications shall not weigh less than... - answer12 oz per sq. ft. T or F: separate facilities shall be required for dwelling units and sleeping units. - answerfalse separate facilities are not required in structures or tenant spaces with a total occupant load including employees and customers of... - answer15 or fewer. separate facilities are not required in Mercantile occupancies in which the max occupant load is.. - answer100 or fewer in occupancies other than malls, the public/employee toilet facilities shall be located...? - answerno more than 1 story above or below and path of travel not more than 500 feet. where should public and employee toilet facilities be located in malls? - answernot more than 1 story above or below with path of travel no more than 300 feet. what type of facilities shall be in excess of required minimum? - answerpay facilities T or F: egress door for multiple occupant toilet room other than family or assisted use rooms should be lockable from the inside - answerFalse directional signage to required public toilet facilities. - answerposted in a lobby,corridor, aisle or similar space so the sign can be readily seen from main entrance. drinking fountains distance from individual tenant space that doesn't have a drinking fountain. - answerwithin 500 feet of the most remote location in tenant space, and not more than one story above or below. if in a mall with
Written for
- Institution
- Journeyman Plumbing
- Course
- Journeyman Plumbing
Document information
- Uploaded on
- March 7, 2024
- Number of pages
- 19
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
journeyman plumbing test study guide with latest s
Also available in package deal