Ultimate 4th Class Part A Power Engineering Study Guide Questions with Verified Answers
Ultimate 4th Class Part A Power Engineering Study Guide Questions with Verified Answers Which of the following is not a definition of a power plant? Any one or more boilers in which steam or other vapour is generated at less than 57 kPa (8 psi). 3 multiple choice options Early government involvement in certification of power engineers became more important for the following reasons except: pollution 3 multiple choice options Which of the following is not characteristic of increased automation in power plants? manual flame checking 3 multiple choice options "Power plant" means any one or more boilers in which steam or other vapour is generated at more than 103 kPa (15 psi). 3 multiple choice options Power engineers are skilled workers who operate and maintain the equipment in a power plant. 3 multiple choice options In the early days, owners of power plants hired __________ workers, who started out doing manual labour and through acquired experience they were promoted to jobs with gradually increasing levels of skill. unskilled 3 multiple choice options In order to produce greater efficiency, higher boiler pressures were used and this led to __________ due to employing of unqualified operators in a power plant. serious accidents 3 multiple choice options Which of the following is not a common work schedule for power engineers? Seasonal lay-offs 3 multiple choice options When oil mixes with water in the boiler the resultant effect is: serious foaming 3 multiple choice options The holder of a Certificate of Competency, the classification of which authorizes him or her to act as a engineer, may sketch, construct, install, operate, repair, and give advice on all things pertaining to any __________ in which that person is employed. power plant 3 multiple choice options Power engineers can usually expect to work rotating shifts. 3 multiple choice options In a power plant, the power engineer may function as a supervisor who directs others in the __________ operation on a shift. safe and efficient 3 multiple choice options Committees which establish standards are composed primarily of which of the following elements? experts from the industry, professional and insurance groups and all levels of government 3 multiple choice options Which of the following certificates of competency qualifies the holder to take charge of the general care and operation of any power plant as chief steam engineer, and to supervise the engineers in that plant and take charge of a shift in any power plant as shift engineer? First Class Engineer's Certificate of Competency 3 multiple choice options Which of the following duties is a holder of a Fourth Class Engineer's Certificate of Competency not qualified to perform? Take charge of a shift in a power plant having a capacity of more than 10,000 kW, as shift engineer. 3 multiple choice options Which of the following is required in order to progress to a higher certificate? Education, experience, and the next lower level
Written for
- Institution
- Ultimate 4th Class Part A Power Engineering
- Course
- Ultimate 4th Class Part A Power Engineering
Document information
- Uploaded on
- March 7, 2024
- Number of pages
- 111
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
ultimate 4th class part a power engineering study
Also available in package deal