100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Traffic Supervisor Exam 2025/2026 Questions & With Correct Answers Already Graded A.

Rating
4.3
(6)
Sold
32
Pages
41
Grade
A+
Uploaded on
06-03-2024
Written in
2023/2024

Traffic Supervisor Exam 2025/2026 Questions & With Correct Answers Already Graded A.

Institution
ATSSA
Course
ATSSA











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ATSSA
Course
ATSSA

Document information

Uploaded on
March 6, 2024
Number of pages
41
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Traffic Supervisor

Is a shadow vehicle used in all traffic zones?
A. True
B. False - ANS False

The shadow vehicle is occupied whenever workers are in the work area.
A. True
B. False - ANS False

What class one light is the shadow vehicle equipped with?
A. Flashing Yellow Light
B. Oscillating Yellow Light
C. Yellow Strobe Light
D. All of the above - ANS All of the above

When may cones be substituted for drums?
A. Daytime traffic control minimum height 18"
B. Daytime traffic control minimum height 28"
C. Daytime traffic control minimum height 36"
D. Daytime traffic control minimum height 42" - ANS Daytime traffic control minimum height 28"

When may cones be substituted for drums?
A. Daytime traffic control minimum height 18"
B. Daytime traffic control minimum height 28"
C. Daytime traffic control minimum height 36"
D. Daytime traffic control minimum height 42" - ANS Daytime traffic control minimum height 28"

When cones are substituted for drums for nighttime closers, what is the minimum cone height
requirement?
A. 18"
B. 28"
C. 36"
D. 42" - ANS 42"

When cones are substituted for drums at nighttime closer, what is the maximum cone spacing?
A. 20'
B. 30'
C. 40'
D. 50' - ANS 40'

What type of flashing warning lights are required when there is a nighttime lane closer?

,A. ROAD WORK AHEAD
B. LANE CLOSED AHEAD
C. A & B
D. NONE OF THE ABOVE - ANS ROAD WORK AHEAD
&
LANE CLOSED AHEAD

If there is a lane closure of greater than three days, what is required?
A. Work zone dotted lines, 4' in length separated by 10' gaps, shall be provided to identify the
merge.
B. The appropriate color work zone edge lines shall be applied along the taper and tangent
sections.
C. All the above
D. None of the above - ANS The appropriate color work zone edge lines shall be applied along
the taper and tangent sections.

Work zone pavement marking that conflict with final traffic lanes shall be temporary paint.
A. True
B. False - ANS False

What are the extra advance warning signs?
A. Lane Close Ahead
B. Watch for Stopped Traffic
C. Road Work Ahead
D. All the above - ANS Lane Change Ahead
&
Watch for Stopped Traffic
&
Road Work Ahead

Is the advisory speed plaque used in all traffic zones?
A. True
B. False - ANS False

When the approach speed limit is 40 mph or less, 36" warning signs may be used.
A. True
B. False - ANS True

Road Work Ahead signs shall be provided on entrance ramps or roadways entering the work
limits.
A. True
B. False - ANS True

End Road Work signs are only required for lane closures of more than ______ day.

,A. 1
B. 2
C. 3
D 4 - ANS 1

Sign spacing should be adjusted to avoid conflict with existing signs, minimum spacing to
existing signs shall be 200' for speeds of 45 mph or less and a minimum of 400' for speeds 50
mph or greater.
A. True
B. False - ANS True

The minimum acceptable length for the merge taper shall be determined by _________ the
width of the offset by the merge taper rate.
A. Subtracting
B. Adding
C. Divide
D. Multiplying - ANS Multiplying

The tangent (recovery area) section between the two merge tapers should be 2 times longer of
the two merge tapers.
A. True
B. False - ANS True

What is a fundamental principle of temporary traffic control?
A. To inconvenience motorists as much as possible so they will find another route.
B. To guide and direct motorists through or around the work area as efficiently as possible. C. To
make traffic move as slow as possible.
D. All of the above are fundamental principles. - ANS To guide and direct motorists through or
around the work area as efficiently as possible.

What needs to be done when work is suspended for any length of time?
A. Take down the ROAD WORK AHEAD sign
B. Cover up the END ROAD WORK sign
C. Erect a WORK SUSPENDED sign
D. Cover or remove the FLAGGER AHEAD sign - ANS Cover or remove the FLAGGER AHEAD
sign

What are the four zones of a work area?
A. Activity area, pedestrian area, termination area and equipment area.
B. Advance warning area, transition area, activity area and termination area.
C. Equipment area, termination area, activity area and transition area.
D. Transition area, advanced warning area, pedestrian area and buffer zone. - ANS Advance
warning area, transition area, activity area and termination area.

, Which of the following signs might you see in the advanced warning area?
A. END ROAD WORK
B. YIELD
C. EXIT OPEN
D. LEFT LANE CLOSED AHEAD - ANS LEFT LANE CLOSED AHEAD

Which of the following is NOT a type of taper?
A. Shifting taper
B. Merging taper
C. Aligning taper
D. Downstream taper - ANS Aligning taper

The formula for taper length on expressways with a speed limit of 65mph is which of the
following?

A. L = (WxS2)/60
B. L = WxS
C. L = W2xS
D. L = (S2x60)/W - ANS L = WxS

What would the taper length be when closing a 12' lane on an expressway with a speed limit of
60 mph?
A. 880'
B.780'
C.660'
D. 720' - ANS 720'

What would the taper length be when closing a 14' lane on a road with a speed limit of 35 mph?
A. 235.3'
B. 285.8'
C. 288.5'
D. 490.0' - ANS 285.8'

What would be the taper length when working on a road with 12' lanes and a speed limit of 55
mph and you were using flagger control of traffic?
A. 660'
B. 780'
C. 605'
D. 100' - ANS 100'

Regarding temporary traffic control, what is a diversion?

A. Something to do while waiting for an asphalt truck.
B. Routing traffic onto an existing roadway.

Reviews from verified buyers

Showing all 6 reviews
6 months ago

6 months ago

I do appreciate for your review ,all the best in your exams. Kindly refer your colleague to my page.

7 months ago

6 months ago

I do appreciate for your review ,all the best in your exams. Kindly refer your colleague to my page.

9 months ago

9 months ago

I do appreciate for your review ,all the best in your exams. Kindly refer your colleague to my page.

10 months ago

10 months ago

I do appreciate for your review ,all the best in your exams. Kindly refer your colleague to my page.

1 year ago

1 year ago

Thank you for your recent purchase & Review of my study material. It means a lot to me that you have chosen to invest in your education and I hope that the materials have been helpful to you. I wish you all the best in your studies.

1 year ago

1 year ago

Thank you for the review. All the best in your study and welcome for more. Guaranteed Pass. Tell a friend to tell a friend about it kindly.

4.3

6 reviews

5
2
4
4
3
0
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
phyliswambui996 Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
225
Member since
2 year
Number of followers
80
Documents
3105
Last sold
23 hours ago
NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters

Boost your exam performance with my comprehensive study package Deals {CHECK OUT DISCOUNTS ON MY BUNDLES, I ASLO OFFER PACKAGE DEALS TO ALL MY STUDY MATERIAL} I have developed a range of study materials that cover all aspects of Courses, from the basics to advanced topics. My materials are designed to provide clear and concise explanations of complex concepts, with plenty of helpful examples and practice problems to reinforce your learning. I've received multiple academic awards during my time at university and have been recognized for my excellence in teaching. Download my materials today and start acing your exams!

Read more Read less
4.0

46 reviews

5
24
4
10
3
5
2
2
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions