DVP SWPPP Flashcards 61 Questions With Complete Solutions
The 1970s law that set into place the regulation of stormwater is - ️️The clean water act Requirements for managing stormwater activity on a construction site are outlined in the following regulation - ️️NPDES Which of the following is never an allowable stormwater discharge from a construction site - ️️Discharge from contaminated ground water The notice of termination can be filed when - ️️All construction activity, inside and outside of the building, is complete and permanent stabilization has been verified as adequate to meet permit requirements Relative to stormwater permitting all of the following must occur before construction starts except - ️️Submit the notice of termination (NOT) The stormwater notice of intent (NOI) must be submitted - ️️After the SWPPP is prepared and before starting construction Potential pollutant sources stored on a construction site may include - ️️1. Petroleum storage tanks 2. Soil sediments 3. Masonary material 4. ALL OF THE ABOVE The SWPPP inflammation sequence may be modified - ️️After consulting with the project SWPPP Designer (CEC) and, if required, the project owner and receiving written approval
Written for
- Institution
- DVP SWPPP
- Course
- DVP SWPPP
Document information
- Uploaded on
- March 4, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers