ACI Aggregate Testing Technician Exam Questions and Answers 100% Pass
ACI Aggregate Testing Technician Exam Questions and Answers 100% Pass Performance Checklist: Sampling of Aggregates: Flowing Aggregate Stream (Bins or Belt Discharge) 5 steps - Answer-1. Use a device that will hold the required amount of material without overflowing. 2. Take each increment from the entire cross section of the material discharge stream 3. Obtain a minimum of three approximately equal increments. 4. Combine the increments to form a field sample. 5. Ensure that the size of the field sample equals or exceeds the approximate minimum mass needed or stated in Table 1. Performance Checklist: Sampling of Aggregates: Conveyor Belt 7 Steps - Answer-1. Stop the conveyor belt and insert two templates conforming to the shape of the belt into the aggregate steam. 2. Space the templates so the material between will yield an increment of the required mass. 3. Carefully scoop the material between the templates into a suitable container. 4. Collect the fines with a brush and dust pan and add to the container. 5. Obtain a minimum of three approximately equal increments. 6. Combine the increments to form a field sample. 7. Ensure that the size of the field sample equals or exceeds the approximate minimum mass needed or stated in Table 1. Performance Checklist: Sampling of Aggregates: Stockpiles (Manual Sampling) 7 Steps - Answer-Course Aggregate 1. Shove a board vertically into the pile just above the sampling point. 2. Take increments from the top third, mid-point, and bottom third of the volume of the pile. Fine Aggregate 3. Remove the outer layer and sample from the material beneath. 4. Insert the appropriate sampling tube randomly to extract the increments. 5. Obtain a minimum of five increments. Coarse and Fine Aggregate 6. Combine the increments to form a field sample. 7. Ensure that the size of the field sample equals or exceeds the approximate minimum mass needed or stated in Table 1. Performance Checklist: Sampling of Aggregates: Transportation Units (Manual Sampling) 7 Steps - Answer-1. Excavate a minimum of three trenches at points across the unit that will give an estimate of the characteristics of the load. 2. Ensure the trench bottom is level and the trench is 0.3m in both with and depth. Coarse Aggregate 3. Obtain an increment by pushing a shovel downward into the material. 4. Obtain a minimum of three increments from approximately equally spaced points along each trench. Fine Aggregate 5. Insert the appropriate sampling tube to extract the appropriate number of increments. Coarse and Fine Aggregate 6. Combine the increments to form a field sample. 7. Ensure that the size of the field sample equals or exceeds the appropriate minimum mass needed or stated in Table 1
Written for
- Institution
- ACI
- Course
- ACI
Document information
- Uploaded on
- March 1, 2024
- Number of pages
- 16
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci aggregate testing technician exam questions an
Also available in package deal