100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
27-02-2024
Written in
2023/2024

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS Acceptance - Answer-The written acceptance by the Department of the Work. acceptance testing - Answer-Testing conducted by the Department to measure the degree of compliance to the Contract actual cost - Answer-The computed cost using calculations provided addendum - Answer-A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity - Answer-The quantity of a completed Item eligible for payment authorized funding amount - Answer-The amount of funds authorized by the Department for the Contract Bidder - Answer-The individual, firm, partnership, corporation, joint venture, or any acceptable combination thereof that submits a bid to the Department. bridge - Answer-. A structure, other than a culvert, including supports, erected over a depression or an obstruction, such as water, highway, or railway, and having a track or passageway for carrying traffic or other moving loads and having a length 3 measured along the center of the structure of more than 20 feet between undercopings of abutments or extreme ends of openings for multiple boxes. Structure dimensions are defined as follows: bridge length - Answer-The overall length measured along the line of survey stationing from back to back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but, in no case less than the total clear opening of the structure bridge width - Answer-The clear width measured at right angles to the longitudinal centerline of the bridge between the bottom of curbs, or in the case of multiple height of curbs, between the bottoms of the lower risers or, if curbs are not used, between inner faces of parapet or railing Change Order. - Answer-A written order issued by the Department to the Contractor after execution of the Contract authorizing one or more of the following: 1. Changes in the Work. 2. Modifications in the basis of payment. 3. Modifications to Contract Time. Commercially Useful Function - Answer-Occurrences in which the subcontractor is responsible for the execution of a distinct element of the work of a contract and carrying out its responsibilities by actually performing, managing, and supervising the work involved, and with respect to materials and supplies used on the contract, prepares the estimate, negotiates price, determines quality and quantity, orders the material, arranges delivery, installs (where applicable), and pays for the material and supplies itself for the project. Completion - Answer-When all of the following have occurred: 1. The Work has been satisfactorily completed in all respects according to the Contract. 2. The Project is ready for use by the Department as required by the Contract. 3. The Contractor has satisfactorily executed and delivered to the RE all documents, certificates, and proofs of compliance required by the Contract including the Notice of Completion. construction operations - Answer-Physical work done in the performance of the Contract within the Project Limits. Does not include off-site mobilization, procurement and off-site storage of materials and plants, engineering, performance bond and payment bond,

Show more Read less
Institution
NICET
Course
NICET









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NICET
Course
NICET

Document information

Uploaded on
February 27, 2024
Number of pages
10
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BrittieDonald Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
399
Member since
2 year
Number of followers
162
Documents
20443
Last sold
1 day ago
BrittieDonald Study Solutions.

Get Help in Your Due Online and Actual Exams, Assignments with Well Researched and Up-to date Study Materials for Guaranteed Success

3.3

79 reviews

5
31
4
13
3
7
2
5
1
23

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions