NICET LEVEL III WATER BASED LAYOUT 2024
NICET LEVEL III WATER BASED LAYOUT 2024 General Conditions •contract •specifications •contract drawings General Conditions What is not included in the technical specification? Bid documents include? Codes, standards, Authority Having Jurisdiction (AHJ), clean-up, safety requirements, barricades, fencing, insurance and bond requirements, ect. Supplementary Conditions payment schedules Addendums, time schedules, working days allowed, delay agreements, Construction Specifications Institute (CSI) Contractors Specifications typically use what format? Construction manager concept is when the owner contracts with the construction manager who oversees ____________ working on the project Design-Build Concept general contractor Sometimes referred to as a turn-key type agreement or contract? Multiple Prime Contractor Method has the intent is eliminate the middleman __________ __________. •architectural/structural contractor •mechanical contractor •electrical contractor which consist of? •federal government Multiple prime contractor method involve more than one prime contractor •general services administration (GSA) •large companies Who commonly uses the multiple prime contractor method? Traditional method contract uses the typical Owner, architect, general contractor, subcontractor chain of command which is? •open bid method •bid-by invitation procedure •direct contractor selection which is? General contractors can be chosen in a number of different ways General category and supplementary conditions categories which is? Contract conditions is divided into two Addendum Changes to the contract or other modifications. •up-front payments •progress payments •lump sum Types of payment schedules are? Bidding requirements, sample forms, conditions of the contract and specifications, including general conditions and supplementary conditions •contract itself •contract conditions •specifications •drawings Contract documents include: What comprises the project manual? Preliminary, bid, approval, construction, as-built Request for proposal (RFP) Drawings have different stages which are? Oftentimes a project will begin with a _________. •certified value specialist •owner's representatives •designers and consultants •the construction team •cost estimator •building management staff •third-party (independent) reviewers •Information gathering •brainstorming •analysis •development •recommendations Value-engineering team typically consist of? Value-engineering typically goes through phases which are? Planning stage At what stage does value-engineering provide the most benefit?
Written for
- Institution
- NICET LEVEL III WATER BASED LAYOUT 2024
- Course
- NICET LEVEL III WATER BASED LAYOUT 2024
Document information
- Uploaded on
- February 24, 2024
- Number of pages
- 17
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nicet level iii water based layout 2024
Also available in package deal