Michigan Builders License Exam Questions With Correct Answers Latest Update 2024/2025 | 100% SOLVED
Michigan Builders License Exam Questions With Correct Answers Latest Update 2024/2025 | 100% SOLVED. Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - Correct Answer-IRC (International Residential Code) Administrative - Correct Answer-First 2 chapters of code book are True - Correct Answer-Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F Yes - Correct Answer-Does the building official have the authority to render interpretations of the code? 8 foot fence. - Correct Answer-None of the following require a permit, EXCEPT: sidewalks and driveways tiling an 8 foot fence playground equipment False - Correct Answer-Tables and illustrations are always supported by information found in the written code and footnotes. T or F Live load. - Correct Answer-The amount of evenly distributed weight imposed by inhabitants, goods and removable objects on a floor or roof system is referred to as True. - Correct Answer-If a code requirement is in the book, it is both acceptable and enforceable by the code official. T or F Figures. - Correct Answer-Illustrations are typically referred to as Determine that buildings are built to the minimum enforceable standard. - Correct Answer-Generally speaking, the building official's job is to True. - Correct Answer-It is required that all manufacturer instructions be at the jobsite at the time of inspection. T or F Kitchen. - Correct Answer-All of the following are not considered habitable spaces EXCEPT: bathrooms Michigan Builders License Exam Questions With 100% Correct Answers | Verified | Latest Update 2024/2025 kitchens storage spaces closets 3. - Correct Answer-Bathrooms must be provided with an aggregate glazing area no less than _____ square feet, half of which must be openable. 44 inches. - Correct Answer-The maximum height of an egress window above the floor is 5.7 sq ft. - Correct Answer-A basement bedroom must have an egress window with a clear opening of at least ______ square feet. 3. - Correct Answer-At least one side-hinged exit door must be in each dwelling unit, and must be _____ feet wide. 30 inches. - Correct Answer-A porch more than _____ inches above grade must be provided with 36" guards. 200. - Correct Answer-Wall and ceiling finishes shall have a flame-spread classification of no more than ______ . 7 days. - Correct Answer-According to code, concrete must reach at least 70% of it's ability within ____________days. 40%. - Correct Answer-A stud used for a non-bearing partitions may not be notched more than ____% of the stud width. Additions, alterations, renovation and repairs. - Correct Answer-The Michigan Uniform Energy code applies to new buildings as well as U-factor. - Correct Answer-___________ is a measure of how well the window or door assembly conducts heat. The lower the number, the better insulation the assembly will provide. 50%. - Correct Answer-Energy losses from recessed lighting fixtures can often reach ___% of the total thermal loss of a ceiling. R-3. - Correct Answer-Michigan requires a minimum thermal resistance of ____________for mechanical system piping. True. - Correct Answer-Oversized HVAC equipment has a higher initial cost, a higher operating cost, provides less comfort, and shorter life expectancy. T or F Prescriptive Path. - Correct Answer-_______ is the compliance route that applies Table 402.1.1 to building envelope components, and is considered the most simple. Area weighted averages. - Correct Answer-___________ can be used to satisfy Ufactor and SHGC requirements. IC (Insulation Contact) - Correct Answer-Recessed lights must be _____ rated. True. - Correct Answer-Up to 15 square feet of glazing per dwelling unit is exempted from U-value requirements. T or F Registered design professional. - Correct Answer-The 2009 IECC requires a permanent certificate posted on the electrical distribution panel. The certificate shall be completed by the builder or State energy code requirements. - Correct Answer-One hurdle contractors face when bidding for an energy efficient project is choosing materials that fit the design, and also meet False. - Correct Answer-Historically significant buildings are not exempt from code changes. T or F R-value Settled thickness Manufacturer name - Correct Answer-Insulation products (blown and sprayed) must be documented with: March 2011. - Correct Answer-The new Michigan codes took effect in 10. - Correct Answer-Below grade walls are insulated from the top of the basement wall down to _____ below grade, or the basement floor, whichever is less. Area weighted average. - Correct Answer-The _______ is the combined Solar Heat Gain Coefficient of all the glazed fenestration products in the building. Thermal insulation R-values Design criteria Equipment systems - Correct Answer-Plans and specifications must be detailed in regards to: 2009. - Correct Answer-In Michigan, the residential energy code is based on the _____ IECC, with certain amendments. Air leakage. - Correct Answer-___________ is the rate of air infiltration in the presence of a specific pressure differential. Windows Attic access hatches Recessed lights - Correct Answer-Air leakage is the random movement of air into and out of ________ through cracks and holes. Table 402.1.1 2009 IECC - Correct Answer-R-values for insulation and fenestration requirements by component can be found in International Energy Conservation Code - Correct Answer-IECC U-factor and UA alternatives. - Correct Answer-The _____________ compliance method allows for more innovative construction techniques like SIPs or Advanced Framing. 500 sq feet - Correct Answer-R-30 is permitted in vaulted ceilings, but is limited to True. - Correct Answer-Floor insulation must be installed to maintain permanent and continuous contact with the underside of the subfloor decking. T or F 5, 6 and 7. - Correct Answer-Michigan falls into climate zones False. - Correct Answer-It is permissible for supply ducts to be run through the framing cavities of a residential building. T or F IC rated (Insulation Contact) - Correct Answer-__________ means an electrical fixture has been tested and listed as suitable for installation in a cavity where the fixture may come in contact with insulation. 3%. - Correct Answer-According to the Dept. of Energy, improved energy codes could reduce CO2 emissions by 300 sq ft. - Correct Answer-Attic insulation markers must be installed every _____ square feet. True. - Correct Answer-Buildings that are exempted from the new regulations are those with very low energy use or ones that are neither heated or cooled. T or F Yes. - Correct Answer-A contractor needs to remove a non-load bearing wall, does he need to pull a permit? No. - Correct Answer-A concrete contractor has been hired by an owner to install a driveway and sidewalks. The lot is flat and the concrete is being place on undisturbed earth with a prepared base. Does the contractor need to pull a permit? Yes. - Correct Answer-A permit has been issued for a building project and there is a code infraction in the building plans that has been overlooked by the building official. Can the building official require a correction to a project that they previously overlooked? Health department. - Correct Answer-Who issues a well and septic permit? 200 sq. feet. IRC R105 - Correct Answer-Permits are not required for one story detached accessory structures not exceeding: The next business day. - Correct Answer-If work requiring a permit is provided in an emergency situation, the permit application must be submitted within: True. - Correct Answer-If an inspection official is refused entry to a building project, the official will have recourse to the remedies provided by law which include securing a warrant from the court and returning with an officer of the law. No. IRC R104.8 - Correct Answer-Can a building official be held liable for any damage occurring to persons or property as a result of their actions or inaction? Yes. - Correct Answer-An owner needs a foundation wall repaired, it has seriously buckled due to excessive lateral loading from soil pressure. Does the contractor need to pull a permit?
Written for
- Institution
- Michigan builders license
- Course
- Michigan builders license
Document information
- Uploaded on
- February 21, 2024
- Number of pages
- 59
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- michigan builders license
- builders license
- michigan
- latest update 2024
- graded and verified
-
michigan builders license exam
-
builders license exam questions and answers
Also available in package deal