PJM Sample Test Review | 150 Questions With 100% Correct Answers | Verified | Latest Update 2024 | 100% Pass
PJM Sample Test Review | 150 Questions With 100% Correct Answers | Verified | Latest Update 2024 | 100% Pass Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - off cost out of merit. Monitoring ___________ may give insights into system constraints. - Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - PJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. - light load period When PJM declares a hot weather alert, the generation dispatcher should determine if maintenance can be deferred and notify all generating stations and key personnel. - During system restoration, the two categories of reserves are dynamic and spinning. - During system restoration, frequency should be maintained between 59.75 and 61.00 Hertz. - PJM issues a heavy load voltage schedule. Member companies who own generation facilities should ensure voltage regulators on generating units are in service & automatic. - A unit being dispatched economically by PJM should set its megawatt output based on the unit's dispatch rate or desired megawatt level. -
Written for
- Institution
- PJM Generation
- Course
- PJM Generation
Document information
- Uploaded on
- February 18, 2024
- Number of pages
- 32
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal