CSU CON 101 EXAM 1 QUESTIONS AND ANSWERS 100% PASS
CSU CON 101 EXAM 1 QUESTIONS AND ANSWERS 100% PASS Six Dials of Project Scope -cost -time -quality -safety -scope -function Three-legged-stool -time -cost -quality Design-bid-build Traditional project delivery method -owner holds two separate contracts for design and build Agency CM Cons. Manager acts on the owners best interest but is not financially responsible GMP Guaranteed Maximum Price Multiple Prime Contracting method where the owner bypasses a General Contractor and enters into multiple contracts with contractors Design-build Newer delivery method where there is only 1 contract between the owner and Design/Builder. Design/Builder is responsible for both ends. Fast-tracking a practice utilized to speed up job by overlapping the design and construction phrase. IPD Integrated Project Delivery In what time period was the concept of a Theoretical Architect developed? The Renaissance When was concrete first used? During the Roman Empire What is an individual responsible for the design, engineering, and construction of a project? Master builder How is the Code of Hammurabi important to construction? First known recorded building code. What were some of the changes in building materials that contributed to growth of the building industry in the late 1880's? Steel framing replaced iron framing, invention of Portland Cement and reinforcing, mass production of glass, and the invention of the passenger elevator. What is horizontal construction? Heavy Civil Construction Which sector of the construction industry requires the broadest range of knowledge for a contractor to be successful? Residential What are the 5 construction industry sectors? Residential, Commercial, Heavy Civil, Industrial, and Environmental In which industry sector are Engineers often the lead designers? Industrial Which industry sector is comprised of projects that maintain public health and contribute to a community's quality of life while improving the environment? Environmental Construction What are the "owner, the designers, and the contractor? Primary Players in a construction project. Who deals with the function, life safety issues, and aesthetics of the building? Architect. What are subcontractors, material suppliers, and equipment vendors? 1st level Secondary Players Who is central to every project? Owner Who is responsible for design of heating, cooling and plumbing systems? Mechanical Engineers Who determines which project delivery method will be used? Owner What are the parameters defining the overall extent of work? Scope of Work What is a construction manager that offers advice to the owner but is not responsible for any of the actual construction? Agency CM What is delivery method in which there is only one contract? Design - Build What provides a unique opportunity for construction professionals to participate in the design stage in a proactive fashion? IPD (Integrated Project Delivery) What contains information regarding bidding documents for public projects? Bid Solicitation or Advertisement for Bid What is low bidder announced at bid opening?
Written for
- Institution
- CSU CON 101
- Course
- CSU CON 101
Document information
- Uploaded on
- February 17, 2024
- Number of pages
- 11
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
csu con 101 exam 1 questions and answers 100 pas
Also available in package deal