100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI Concrete Testing Exam Questions and Answers | 100% Correct | 2024 Updated

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
15-02-2024
Written in
2023/2024

ACI Concrete Testing Exam Questions and Answers | 100% Correct | 2024 Updated ASTM C31 - Answer ️️ -Making and curing concrete test specimens in the field ASTM C231 - Answer ️️ -Concrete Air Content Test - Pressure Method ASTM C173 - Answer ️️ -Concrete Air Content Test - Volume Method ASTM C172 - Answer ️️ -Sampling Fresh Concrete ASTM C143 - Answer ️️ -Standard Test Method for Slump of Hydraulic-Cement Concrete ASTM C138 - Answer ️️ -Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete ASTM C1064 - Answer ️️ -Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of _____ into the freshly mixed concrete - Answer ️️ -3" The temperature measuring device shall be capable of accurately measuring the temperature of freshly mixed concrete to ___ throughout a range of ____. - Answer ️️ -1 degree, 30 to 120 degrees The temperature measuring device shall be verified ___, or whenever there is a question of ____. - Answer ️️ -annually, accuracy The temperature of concrete may be measured in a wheelbarrow. - Answer ️️ -True The temperature of concrete may be measured in a wall form. - Answer ️️ -True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine the temperature. - Answer ️️ -False What must be done to the sample container prior to sampling the concrete? - Answer ️️ - dampen with water What must be done to the concrete surrounding the temperature measuring device after the device is submerged in concrete? - Answer ️️ -Tap the edges How long must the temperature measuring device remain in the freshly mixed concrete? - Answer ️️ -2 min, no more than 5 min After the temperature of concrete is read, what is required? - Answer ️️ -Reporting of the temperature The temperature of the concrete is reported to the nearest ___ - Answer ️️ -0.5 degree According to Test Method C1064/C1064M, what is one reason to take the temperature of concrete? - Answer ️️ -To confirm compliance A maximum temperature of freshly mixed concrete is specified in test method C1064/C1064M - Answer ️️ -False The sample of concrete used for temperature determination must be rodded 25 times. True or False? - Answer ️️ -False Sampling by C172 covers procedures for obtaining representative samples, on which tests are to be performed to determine ___ with quality requirements of the specifications under which the concrete is furnished. - Answer ️️ -compliance C172 covers sampling from five types of equipment, which are ___________, ___________, __________, __________, and __________. - Answer ️️ -Stationary mixers, paving mixers, revolving drum mixers, continuous mixers, open top mixers The elapsed time between obtaining the first and final portions of a composite sample shall not exceed ___. - Answer ️️ -15 min Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample. - Answer ️️ -True Start tests for slump, temperature, and air content within ___ after obtaining the final portion of the composite sample. - Answer ️️ -5 min Start molding specimens for strength tests within how many minutes after fabricating the composite sample? - Answer ️️ -15 min The concrete sample must be protected from contamination and - Answer ️️ -rapid evaporation The minimum size sample for making strength test specimens is - Answer ️️ -1 CF When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - Answer ️️ -2 When sampling from a drum truck mixer, sample the concrete by collecting ___ or more portions take at regularly spaced intervals during discharge of the middle portion of the batch - Answer ️️ -2

Show more Read less
Institution
ACI Concrete
Course
ACI Concrete









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI Concrete
Course
ACI Concrete

Document information

Uploaded on
February 15, 2024
Number of pages
10
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmilyCharlene Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
442
Member since
2 year
Number of followers
139
Documents
21009
Last sold
2 days ago
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3.6

96 reviews

5
44
4
13
3
15
2
7
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions