ACG Guideline 110 Questions with 100% Correct Answers | Verified | Latest Update And Verified
What are the five phases of commissioning? - ️️1.) Pre-Design 2.) Design 3.) Construction 4.) Acceptance 5.) Post-Acceptance Studies indicate _ to _% savings in building operating costs when comparing a comissioned building to a non-commissioned building. - ️️8 to 20% What is commissioning? - ️️A process of documentation, adjustment, testing, verification, and training performed specifically to ensure that the finished facility operates in accordance with the owner's documented project requirements and the construction documents. Commissioning serves the owner's best interests by delivering a facility with systems that perform as specified, intended, and paid for. What does DID mean and provide a brief definition? - ️️Design Intent Document - Details functional requirements and Owner's expectations of how a building will be used and operated - Owner's Project Requirements What does BOD mean and provide a brief definition? - ️️Basis of Design - The concepts, calculations, decisions, and product selections used to meet the Owner's Project Requirements. Designer's (A/E) services typically (do or do not) include field verification that their design works as intended. - ️️Do NOT Construction Manager's services typically (do or do not) include functional verification that the installed systems meet design intent. - ️️Do NOT
Written for
- Institution
- ACG
- Course
- ACG
Document information
- Uploaded on
- February 11, 2024
- Number of pages
- 15
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal