OSHA Steel Erection Exam Questions With Complete Solution The top rail of a guardrail system must be between _________inches. – ANSWER: 42 Which of the following requirements is true for guardrail systems ? - ANSWER: All of the above Multiple lift rigging assembly manufactured by wire rope rigging suppliers is known as: - ANSWER: Christmas Treeing A personal fall arrest system consist of: - ANSWER: All of the above Before authorizing work to begin, the controlling contractor must provide steel erector with written notification of: - ANSWER: Repairs Replacements Modifications to anchor bolts Who is responsible for safe site layout? - ANSWER: The controlling contractor Generally, written notification must document that concrete in footing, piers , walls, and mortar in masonry piers should have ___________ of minimum compressive design strength - ANSWER: 75% OSHA -indentified components of a site specific erection plan include: - ANSWER: B and C only A crane lift must never exceed a maximum of __ ____ members per lift - ANSWER: 5 A pre -work shift visual inspection of cranes must be preformed by: - ANSWER: A competent person If any deficiency on a crane inspection is identified, an immediate determination by the competent person must be made whet her the crane must be shut down until repairs are made. - ANSWER: True Multiple lift rigging, or Christmas treeing: - ANSWER: Must follow certain criteria to ensure the safety of the lift and personnel receiving the load. Is restricted to use of only manufactured multiple lift rigging assemblies For Steel Assembly, there should not be more than ______ stories between the erection floor and the uppermost permanent floor: - ANSWER: 8
Exam (elaborations)
OSHA Steel Erection Exam Questions With Complete Solution
Rating
Sold
-
Pages
3
Grade
A+
Uploaded on
08-02-2024
Written in
2023/2024
OSHA Steel Erection Exam Questions With Complete Solution
Institution
OSHA
Course
OSHA
Whoops! We can’t load your doc right now. Try again or contact support.
Written for
- Institution
- OSHA
- Course
- OSHA
Document information
- Uploaded on
- February 8, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
osha steel erection exam questions with complete s
-
the top rail of a guardrail system must be between
-
which of the following requirements is true for gu
-
multiple lift rigging assembly manufactured by
Content preview
$12.49
Get access to the full document:
100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached
Also available in package deal
Package deal
OSHA Exams Bundle (Latest 2024 - 2025) Questions With 100% Correct & Verified Answers
7
2024
$ 93.93
More info