100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

AIC Exam 2024 QUESTION WITH 100 CORRECTANSWERS VERIFIED

Rating
-
Sold
-
Pages
44
Grade
A+
Uploaded on
30-01-2024
Written in
2023/2024

In addition to the title of the meeting, the date, time and location it occurred, what are the other important items to include in a meeting minutes? - Answer-List of attendees and who needs to receive a copy of the minutes. Clear and unbiased summary of the major points, discussions, and decisions made. Action items with responsibility and due dates. Which of the following documents is used by a Contractor to communicate to the Design Professional and the Owner what materials and equipment will be ordered, delivered and installed by their Subcontractors? - Answer-Submittal / Shop drawing. Which one of the following is transferred from one mind to another? - Answer-Words What percentage of a conversation does the sender remember of what they say and do? - Answer-90 Which of the following documents is best used for recording activities on the job site? - Answer-Job Diary or Daily Report. Best practices for writing a RFI: - Answer-Issue one RFI per topic/issue, as the issue comes up on the jobsite. Which of the following documents is used for correspondence between the home office and the job site? - Answer-Goals, Gathering, Problem Solving, Decision Making, Action Plan & Monitoring. Which document describes the Suggested Agenda for the Preconstruction Meeting? - AnswerGeneral Requirements What is the best time to distribute the Meeting Minutes to the Participants? - Answer-About one day after the meeting. RFI Logs are kept to keep track of the number of RFI issued on a project. RFI Logs should be reviewed weekly by the Contractor and Design Team. What should a RFI log include? - Answer-RFI number, date is was issued, date is was answered, who is was distributed to, and a short description of the topic/issue.Which of the following documents is used to record that a specific component of a project passed an inspection (example: recording the inspection of rebars before pouring isolated footing concrete on a commercial project?) - Answer-Job Diary or Daily Report.

Show more Read less
Institution
AIC
Course
AIC











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
AIC
Course
AIC

Document information

Uploaded on
January 30, 2024
Number of pages
44
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ACADEMICMATERIALS City University New York
View profile
Follow You need to be logged in order to follow users or courses
Sold
567
Member since
2 year
Number of followers
186
Documents
10590
Last sold
16 hours ago

4.1

96 reviews

5
53
4
12
3
21
2
3
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions