AIC MOCK EXAM QUESTIONS WITH 100 % CORRECT ANSWERS | VERIFIED
What information is used to determine the required contact area of a reinforced concrete footing resting in soil? - Answer-Soil Bearing Capacity What is the following a definition of? "Reducing the duration of a project of a project usually by overlapping phases or activities that were originally planned to be done sequentially." - Answer-Fast- Tracking Which of the following terms refers to the complete process of obtaining materials? - AnswerProcurement Who is responsible for ensuring that all workers on a construction project have and use personal protective equipment? - Answer-Employer A column transfer 80 kips of load to a footing. The soil bearing capacity is known to be 1800 PSF. What is the minimum required area of the footing? - Answer-44.44 Square Feet The size of the WBS should generally not exceed ___ elements. - Answer-100-200 elements. The contract calls for 3011 units. The budget for the work (without overhead or profit) is $7,200.00. To date 412 units have been installed at a cost of $1,250. What is the unit cost to date and the expected profit/loss on this unit? - AnswerYoung's Modulus relates? - Answer-stress and strain when a material is in the elastic region. What is ASHRAE the acronym for? - Answer-American society of Heating, Refrigeration and Air conditioning engineers The design of an outfall sewer requires a 0.5% grade in the pipe. The outlet invert is at sea level 0.00'. The sewer run is 6 miles. What is the pipe invert at the end of the six mile run? - Answer-158.4 feet The transwer of heat by air flow is called: - Answer-Convecti
Written for
- Institution
- AIC MOCK
- Course
- AIC MOCK
Document information
- Uploaded on
- January 30, 2024
- Number of pages
- 21
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal