GA Pest Employee Registration Exam Questions with 100% correct Answers
GA Pest Employee Registration Exam Questions with 100% correct Answers Certified Operator Categories -Correct Answer-household pest control (HPC), wood destroying organisms (WDO), and fumigation (FUM) All wood infestation inspection reports must be issued on the state-approved form. The report is a statement of what was observed and recorded when the structure was inspected. It requires the inspection and documentation of previous and active infestations of: WDO FORMS... -Correct Answer-• Subterranean termites • Powder post beetles • Wood boring beetles • Dry wood termites • Wood decaying fungus Comprehensive Post Construction Soil Termiticide Application -Correct Answer-• Removal of all cellulosic material from under the building • Removal of all wood to earth contacts except pressure treated wood designed for ground contact • Removal of all visible and accessible termite tunnels • Application of an approved termiticide to all exterior and interior soils, consistent with the products label and labeling directions. State regulations may exceed label requirements for drill intervals. Defined Post Construction Soil Termiticide Application -Correct Answer-• Removal of all cellulosic material from under the building • Removal of all wood to earth contacts except pressure treated wood designed for ground contact • Removal of all accessible termite tunnels • Application of an approved termiticide consistent with product label and labeling directions. State regulations may exceed label requirements for drill intervals Post Construction Non Soil Termiticide Applications, Other Than Baits -Correct Answer-• Removal of all cellulosic material from under the building • Removal of all wood to earth contacts except pressure treated wood designed for ground contact • Removal of all visible and accessible termite tunnels • Application of an approved termiticide consistent with product label and labeling directions Post Construction Termiticide Bait Applications -Correct Answer-• Removal of all cellulosic material from under the building • Removal of all wood to earth contacts except pressure treated wood designed for ground contact • Removal of all visible and accessible termite tunnels • Install/service an approved baiting system consistent with the product label and labeling directions. Pre-Construction Termiticide Bait Applications -Correct Answer-Systems must be monitored consistent with the product/system label for one year at no additional cost when installed for pre- construction or to control infestations found during the coverage period of an Official Georgia Wood Infestation Inspection Report Treatment of Powder Post Beetles and Wood Borers -Correct Answer-* Application of
Written for
- Institution
- Georgia Pesticide
- Course
- Georgia Pesticide
Document information
- Uploaded on
- January 29, 2024
- Number of pages
- 25
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
ga pest employee registration exam questions with
Also available in package deal