NERC EXAM QUESTIONS and Answers DEC 2023
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS - b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing Area A b) A net under-generation in the Interconnection c) A loss of load in Balancing Area A d) A loss of load in the Interconnection - b) A net under-generation in the Interconnection What is the penalty for a Balancing Authority violating the Disturbance Control Standard? a) Must carry additional Contingency Reserve b) Must develop a correction action plan c) Must re-evaluate and change its Frequency Bias Setting d) Must increase its Regulating Reserve - a) Must carry additional Contingency Reserve Your ACE is a large negative value and system frequency is 59.80 Hz. Your AGC system is pulsing your units down. What should you do? a) Place AGC in flat frequency control b) Place AGC in flat tie line control c) Suspend AGC and investigate
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- January 29, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal