Asbestos Practice Exam 4 Latest update 2024 actual questions and answers
Asbestos Practice Exam 4 Latest update 2024 actual questions and answers What are common symptoms of mesothelioma? - Answer ️️ -Persistent stomach pain, persistent shortness of breath, persistent chest pain Which of the of the following is a common symptom of lung cancer? - Answer ️️ -Persistent cough or change in cough pattern Which of the following is necessary insurance coverage necessary for asbestos contractors? - Answer ️️ -500,000 per occurrence for bodily injusry and property damage combined Start up sequence is as follows - Answer ️️ -- post warning signs - pre-cleaned and removed removable objects - precleaned and sealed fixed objects - interruped and tagged electrical circuits - precleaned surfaces - sealed off room penetrations - erected containment barriers -energize negative air filtration units - shut down the HVAC system When a worker is removing asbestos from a steam tunnel a small opening, what is requried? - Answer ️️ --constant communication between workers - at least two workers inside tunnel with supplied air respirators - standby workers posted with rescue equipment, including self contained breathing apparatus --> Not required- a bell connected toa long cord which can be activated by workers What should be done with the asbestos records if an asbestos contractor goes out of business after 25 years and there is no one remaining in the business to store the records? - Answer ️️ - He must notify the director of the NIOSH at least 3 months prior to the planned disposing of the records On or after Jan 1, 1987, contractos must be certified to handle ACM of how many square feet? - Answer ️️ -100 or more What is the most common symptom of asbestosis? - Answer ️️ -Shortness of breath or rales If removing more than ____ lf of asbestos pipe insulation or ____ sf of asbestos surfacing material the EPA regional office and or the State must be contacted and given advance notice - Answer ️️ -260, 160 According to GISO 5208, a medical examination must be given how soon after an employee begins asbestos work? - Answer ️️ -Within 30 days of the beginning of work When must DOSH be notified if a condemned building is about to collapse is torn down and 150 sf of ACM is to be removed? - Answer ️️ -With as much advanced notice as possible. Which of the following is necessary when workers are to work in high temperature work areas? - Answer ️️ -The should be trained in emergency procedures for termperature related illnesses and injuries. When is it the safest to handle asbestos? - Answer ️️ -when it is wet What is requried during asbestos training? - Answer ️️ -- notice of the specific nature of the operations - notice of the increased risk of cancer w cigarettes - notices in spanish for spanish speaking workers --- NO - Notice of the history of asbest
Written for
- Institution
- Asbestos
- Course
- Asbestos
Document information
- Uploaded on
- January 20, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
asbestos practice exam 4 latest update 2024
Also available in package deal