CSA W47.1 And CSA W59 Exam Questions With Complete Solutions
CSA W47.1 And CSA W59 Exam Questions With Complete Solutions CSA Standard W59 covers the welding requirements for what type of steel construction? The welding requirements of CSA Standard W59 can be applied to carbon and low-alloy welded steel What types of structures are covered in CSA Standard W59? CSA Standard W59 covers statically- and cyclically-loaded (repetitive loading) structures. What is a low-hydrogen electrode? A low-hydrogen electrode is an electrode that deposits weld metal with a specified maximum limit of diffusible hydrogen. What are the requirements for contractor certification? When mandated in the contract or in the governing design Standard*, all Contractors performing work under this Standard must be certified to CSA W47.1 for welded fabrications. What welding processes are covered in CSA Standard W59? This standard covers the SMAW, GMAW, GTAW, MCAW, FCAW, SAW, ESW, EGW and SW processes. Does CSA Standard W59 specify requirements for stud welding? Yes, Clause 6 has requirements for stud welding. Does CSA Standard W59 contain provisions for pre-qualified joints? Yes, Clause 10 has details for the geometry of joints that are prequalified, provided the welding procedures What base metals can be welded under CSA Standard W59? Welding Supervisor - the company's designated person(s) directly responsible for ensuring that qualified tack welders, welders, and welding operators weld in accordance with approved or accepted welding procedure data sheets in the shop and the field. The requirements for welding symbols are specified in what standard? Welding symbols shall be as shown in AWS Standard A2.4, together with the additional conventions developed for CSA Standard W59 and shown in Annex D of CSA Standard W59. What information should be given on a design drawing? A design drawing should contain: information for preparation of detail and erection drawings; the effective throat thickness shall be defined, if there are partial penetration groove welds. What typical welding information would you expect to find on an erection or detail drawing? A) location, type, size and length of all welds: B) distinguish between shop and field welds; C) groove depths and joint preparations, if there are partial penetration joints,together with the position of welding; D) any notes required, e.g. welding sequence, control of distortion, etc.. What are the types of welds as specified in CSA Standard W59? Welds are classified as groove, fillet, plug or slot welds. What is a complete joint penetration (CJP) groove weld? A CJP groove weld is one that has complete penetration and fusion of weld and base metal throughout the thickness of the joint. What is a partial joint penetration groove weld? A partial joint penetration groove weld is defined as one having joint penetration less than complete Does CSA Standard W59 allow for the use of intermittent groove welds? No. Groove welds must be continuous for the full length of the joint or as otherwise permitted by the Engineer. The Term Bureau Means: Canadian Welding Bureau In this standard the term contractor means: Fabricator or Erector Welding terminology shall be defined as: AWS Standard A3.0 Preheat required for a CAN3-G40.21m 35
Written for
- Institution
- CSA W47.1 And CSA W59
- Course
- CSA W47.1 And CSA W59
Document information
- Uploaded on
- January 18, 2024
- Number of pages
- 16
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
csa w471 and csa w59 exam questions with complete
Also available in package deal