CWEA CSM GRADE 2 - PRACTICE TEST
CWEA CSM GRADE 2 - PRACTICE TEST In order to accurately estimate the flow of a sanitary sewer overflow (SSO) you must have: - answerSpill start time, spill end time and spill rate Providing a plan and schedule to properly manage, operate and maintain all parts of the sanitary sewer system is the goal of a: - answerA sewer system management plan (SSMP) What are the basics elements of a safety program? - answerSafety policy, statement, safety training, accident investigation What factor must be considered when obtaining an easement for construction and maintenance of a collection system? - answerAccess for equipment and personnel As the division manager you receive a request from your board or council, and they want an immediate response. You do not know all the answers you should: - answerRespond with the information available and update them with more If you were a supervisor of two lead workers, one whose work was exceptionally good and a second whose work was substandard, what should you do? - answerDiscuss the problem with the substandard foreman and offer to help before any other action is taken In selecting pipe material for maximum service life which factor is more important? - answerLife expectancy of pipe What affects the flow capacity of a sewer line? - answerPipe size, pipe, material, grade When a grade conflict exists between a Water main and a sewer main, which of the following is the best solution? - answerHave the Water main adjusted and hold the grade on the sewer main Why is the replacement of wastewater collection systems in some downtown streets difficult? - answerCrowding of other underground utilities
Written for
- Institution
- Cwea
- Course
- Cwea
Document information
- Uploaded on
- January 15, 2024
- Number of pages
- 21
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cwea csm grade 2 practice test
Also available in package deal