ACI Concrete Strength Testing Technician CP-19 23rd Ed. | 75 Questions with 100% Correct Answers | Verified | Latest Update 2024
These procedures for capping enable concrete cylinders and cores to meet the standard practices requirements for __________ and __________. - Planeness , perpendicularity Equipment needed for the capping process includes capping __________ , __________ devices and __________ pots. - Plates , alignment , melting. Plates for neat cement and high-strength gypsum plaster caps should be made of __________, __________, __________, or __________. - Glass, metal, granite, diabase Sulfur mortar cap plates should be formed against __________ or __________ plates. - Metal, stone The purpose of the guide bar or bullseye level is to ensure that caps remain perpendicular to the axis of the cylinder within 0.5 degrees. True or False? - True To avoid accidents during reheating of cooled sulfur, use melting pots that have __________. - Peripheral heating The technician should use a stiff layer of __________ to cap fresh concrete cylinders. - Neat cement paste
Written for
- Institution
- ACI Concrete Strength Testing Technician CP-19 23r
- Course
- ACI Concrete Strength Testing Technician CP-19 23r
Document information
- Uploaded on
- January 10, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci concrete strength testing technician cp 19 23r
Also available in package deal