100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI Test Questions and Answers | Verified & Updated 2024

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
10-01-2024
Written in
2023/2024

ACI Test Questions and Answers | Verified & Updated 2024 The total time allowed between obtaining the first and final portions of a composite sample is - Answer ️️ -15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - Answer ️️ -F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample - Answer ️️ -5 minutes Begin molding test specimens within ______ minutes after obtaining the composite sample - Answer ️️ -15 minutes The concrete samples should be protected from - Answer ️️ -the sun, wind, and other sources of rapid evaporation, from contamination When test specimens are to be molded, the minimum size of sample obtained is - Answer ️️ - 28 L (1 ft^3) The primary objective of the sampling process is to obtain a representative sample (T or F) - Answer ️️ -T When sampling from a revolving drum truck mixer collect concrete from ______ portions of the batch - Answer ️️ -2 or more Wet sieving is performed - Answer ️️ -when the concrete contains aggregates larger than appropriate for a test When sampling from a paving mixer it is not acceptable to place 3 small containers on the sub grade in order to obtain the required samples of concrete (T or F) - Answer ️️ -F TEMPERATURE - Answer ️️ - it may require up to ___ min before the temp stabilizes when the NMS of the coarse agg is greater than ___ - Answer ️️ -20min., 3in. The container for the concrete shall be large enough to provide at least ___ inches, or _____ of coarse agg, of concrete in all directions around the TMD - Answer ️️ -3in., 3 x NMS The temperature measuring device shall have the capability of measuring the temperature of the freshly mixed concrete to ± ______ oF accuracy and have a range of ______ to ______ oF. - Answer ️️ -1,30to120

Show more Read less
Institution
ACI Concrete
Course
ACI Concrete









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI Concrete
Course
ACI Concrete

Document information

Uploaded on
January 10, 2024
Number of pages
6
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
taylorpraise

Also available in package deal

Thumbnail
Package deal
ACI Concrete Bundled Exams Questions and Answers | 100% Verified and Updated 2024
-
29 2024
$ 309.21 More info

Get to know the seller

Seller avatar
taylorpraise West Virginia State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
1 year
Number of followers
2
Documents
33
Last sold
1 year ago
ORCHID MARKETPLACE

SUCCESS IN ACADEMIC MATERAILS ie exams, study guides, case study, etc

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions