100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CLC 059 Exam Questions with 100% Correct Answers

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
08-01-2024
Written in
2023/2024

1770 Correct Answer The dir DIR shall determine the general prevailing rate of per diem wages Nothing in this article, however, shall prohibit the payment of more than the general prevailing rate of wages to any workman employed on public work. 1771 Correct Answer not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the public work is performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work fixed as provided in this chapter, shall be paid to all workers employed on public works. EXCEPT orojects $1k or less. -applicable only to work performed under contract -applicable to contracts let for maintenance work. -not applicable to work carried out by a public agency with its own forces. 1771.1 (a) Correct Answer A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, or engage in the performance of any contract for public work unless currently registered and qualified to perform public work. It is not a violation of this section for an unregistered contractor to submit a bid provided the contractor is registered at the time the contract is awarded. 1771.1 (b) Correct Answer Notice of the requirement described in subdivision (a) shall be included in all bid invitations and public works contracts, and a bid shall not be accepted nor any contract or subcontract entered into without proof of the contractor or subcontractor's current registration to perform public work 1771.1 (c) Correct Answer An inadvertent error in listing a subcontractor who is not registered in a bid proposal shall not be grounds for filing a bid protest, provided that any of the following apply: (1) The subcontractor is registered prior to the bid opening. (2) Within 24 hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee (3) The subcontractor is replaced by another registered subcontractor 1771.1 (d) Correct Answer Failure by a subcontractor to be registered to perform public work as required by subdivision (a) shall be grounds for the contractor, with the consent of the awarding authority, to substitute a subcontractor who is registered to perform public work

Show more Read less
Institution
CLC 059
Course
CLC 059









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CLC 059
Course
CLC 059

Document information

Uploaded on
January 8, 2024
Number of pages
6
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExamsGuru Grand Canyon University
View profile
Follow You need to be logged in order to follow users or courses
Sold
345
Member since
2 year
Number of followers
203
Documents
7694
Last sold
14 hours ago
ExamsGuru

Before anything else, preparation is the key to success. We handle all kind of papers with accurate and complete solutions. Kindly send a direct message incase you miss what you are looking for since we will deliver within the shortest time possible. We respond as soon as possible and give guidance accordingly. Refer 3 of Your Friends and get a discount on 2 papers.

3.7

64 reviews

5
29
4
9
3
13
2
4
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions