100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NERC EXAM PREPARATION QUESTIONS AND CORRECT ANSWERS

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
05-01-2024
Written in
2023/2024

NERC EXAM PREPARATION QUESTIONS AND CORRECT ANSWERS BAAL DOES NOT APPLY - Correct Answer: According to BAAL requirements of BAL-001, which of the following statements is true when actual frequency is greater than Scheduled Frequency? Tie Lines - Correct Answer: The ACE equation must include metered data: dynamic schedules, pseudo ties, actual frequency and all__________________ ACE - Correct Answer: A Balancing Authority has a sudden change in demand-supply balance due to a sudden loss of load or generation in their area. The sudden change will be seen instantaneously in which calculated value_____________ 120 MW - Correct Answer: An external generator tripped that was large enough to reduce the frequency from 60.00 Hz to 59.94 Hz. Your balancing Authority's Frequency Bias is 200 MW/0.1 Hz. how many MW would your system initially contribute to frequency support? increase MW output - Correct Answer: Balancing Authority A is currently reading a system frequency of 59.95 Hz. It's Net Actual Interchange is +100 MW and it's Net Scheduled Interchange is +120 MW. If Balancing Authority A's Frequency Bias setting is -100 MW/0.1 Hz, Balancing Authority A's AGC is pulsing its generators to Generator governor control systems - Correct Answer: Which control system on the generators would respond to a drop in system frequency resulting from a loss of generation? 2% - Correct Answer: Load increase in relation to the increase or decrease in frequency. It has been determined that for every 1% change in frequency, load will change approximately ___________% in the same direction in an interconnection system. Large Capacity; small droop setting - Correct Answer: A BA has several units on governor control. The units have different capacities that range from 200 MW to 1000 MW and droop settings from 2% to 5%. The biggest adjustments in MW output in response to to a frequency disturbance will be provided by units that have__________ flat frequency control - Correct Answer: A BA that is operating asynchronously (separated from the interconnection) should switch its AGC to which mode____________ Both the Interchange and frequency portions will contribute - Correct Answer: if the BA selling power to an end user enters the wrong schedule for the upcoming hour, which part of the ACE equation (ACE= (NIa- NIs)-10B(Fa-Fs)-Ime) will cause Inadvertent Interchange to occur as a result of the incorrect schedule? unilateral Payback - Correct Answer: Inadvertent interchange accumulations that are paid back by controlling to a target of non-zero ACE while not exceeding the BAAL is known as, to ensure that the BA's do not excessively depend on other BA areas for meeting their demand or Interchange obligations. - Correct Answer: What is the purpose in accounting for Inadvertent Interchange among the BA's

Show more Read less
Institution
NERC
Course
NERC








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC
Course
NERC

Document information

Uploaded on
January 5, 2024
Number of pages
2
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Dants Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
91
Member since
3 year
Number of followers
43
Documents
4054
Last sold
3 weeks ago
Top your Grade

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Read more Read less
3.8

12 reviews

5
4
4
4
3
2
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions