CHFM Study Guide Questions With 100% Accurate Answers
CHFM Study Guide Questions With 100% Accurate Answers A project estimator is developing a cost estimate for construction of a new diagnostic imaging wing. The projected costs are: Fixed equipment installation charges $700,000 Site isolation $50,000 Annual utilities $425,000 Construction materials $1,200,000 Portable equipment $900,000 Annual depreciation $275,000 What are the expected contractor expenses? - Correct Ans->1,600,000 Which of the following contribute to typical general contractor fees: 1. Permit and inspection fees 2. General conditions 3. Overhead and profit 4. Site condition assessment fees - Correct Ans->2, 3, and 4 Demand side management (DSM) programs are developed and offered to organizations by energy providers to do which of the following during peak service? - Correct Ans->Provide emergency energy demand sources When developing a preventive maintenance program, a facility manager should ensure that an annual test is conducted on every required battery-powered lighting system. This test should be run for NOT less than:
Written for
- Institution
- CHFM
- Course
- CHFM
Document information
- Uploaded on
- January 4, 2024
- Number of pages
- 17
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- chfm
-
chfm study guide questions with 100 accurate answ
Also available in package deal