100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

COMM 225 PROJECT MANAGEMENT Concordia University fall

Rating
-
Sold
-
Pages
31
Grade
A+
Uploaded on
30-12-2023
Written in
2023/2024

COMM 225 PROJECT MANAGEMENT Concordia University fall In the project below, the time duration and symbol of each activity are given. Identify the critical path (Without using CPM; hint: identify all possible paths and find their lengths)?

Show more Read less
Institution
Course











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Study
Unknown

Document information

Uploaded on
December 30, 2023
Number of pages
31
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

COMM-225 PROJECT MANAGEMENT Concordia University fall 2024-2025




Question 1 In the project below, the time duration and symbol of each activity are given. Identify the critical path (Without
Correct using CPM; hint: identify all possible paths and find their lengths)?

Mark 1.00 out of

1.00




a. A B E H




b. A C D H




c. A B D H

d. A F G H




The correct answer is:
A B D H




Question 2 In the project below, the time duration and symbol of each activity are given. Compute the duration of the

,Correct longest path in the project (without using CPM; hint: identify all possible paths and find their lengths)?

Mark 1.00 out of

1.00




a. 17




b. A B E H




c. 21

d. 20




The correct answer is:
21




Question 3 In the project below, the time duration and symbol of each activity are given. What's the slack of path A- C-D-H ?
Correct

Mark 1.00 out of

1.00

, a. A B E H




b. 17




c. 3

d. 4




The correct answer is:
3




Question 4
In the project below, the time duration and symbol of each activity are given. Compute how long should the project take
Correct

Mark 1.00 out of

1.00




from start to finish using the CPM method?




a. 11




b. 12




c. 18

d. 21




The correct answer is:
18

, Question 5 In the project below, the time duration and symbol of each activity are given. Compute the early start of activity 'E'
Correct using the CPM method?
$11.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
smartzone Liberty University
Follow You need to be logged in order to follow users or courses
Sold
3225
Member since
6 year
Number of followers
2291
Documents
14565
Last sold
1 hour ago
AMAIZING EDUCATION WORLD

GET ALL KIND OF EXAMS ON THIS PAGE ,COMPLETE TEST BANKS,SUMMARIES,STUDY GUIDES,PROJECT PAPERS,ASSIGNMENTS,CASE STUDIES, YOU CAN ALSO COMMUNICATE WITH THE SELLER FOR ANY PRE-ORDER,ORDER AND ETC.

3.7

590 reviews

5
262
4
94
3
103
2
31
1
100

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions