100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Case

Tutorial 4 - Exercise+Blanks

Rating
-
Sold
-
Pages
7
Uploaded on
28-03-2018
Written in
2016/2017

Operations Management, Supply Chain Management

Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Institution
Study
Course

Document information

Uploaded on
March 28, 2018
File latest updated on
December 17, 2018
Number of pages
7
Written in
2016/2017
Type
Case
Professor(s)
Unknown
Grade
Unknown

Subjects

Content preview

Operations Management
4. Tutorial: Chapter 4 – Process Design – Blanks
Exercise 1: Process flow analysis of the robot arm production
Robotec Inc. produces the robot arms in 4 production steps. These production steps are “Cut-
ting” of metal sheets, “Welding” of the parts into arms, “Painting” and “Packaging” of the
arms. Three different parts (middle part and right and lef side part) are cut all in once. Four
metal sheets are put ontop of each other. The three parts are cut then in one process step
(twelve parts are the results of this cut). Five of 200 cuts are faulty and all parts of this cut are
not usable. Welding of three parts creates 1% waste. Painting accounts for 0.5% waste.
Calculate how many cuts have to be performed, so that (at least) 1200 faultless robot arms can
be produced.

, 2


Exercise 2: M/M/1-Queues – Packaging Process
RobotTec Inc. Uses robots to package spare parts into bins. The robot is able with its suction
head to pack eight spare parts every 15 seconds. The packing time underlies an exponential
distribution. The planner of the packaging station have estimated that on average 24 spare
parts are arriving per minute at the packing station following a Poisson distribution.
a) How many spare parts would be waiting on average at the packaging station?




b) In fact, 30 spare parts are waiting at the packaging station. Therefore, the arrival rate is
larger. What is the real arrival rate?




c) The planner propose changing the suction head. The new suction head is able to pack
eight spare parts every ten seconds. How many spare parts will be in the queue with this
suction head? (Please use the realistic arrival rate from task 2b))
$6.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
bonouhw

Also available in package deal

Get to know the seller

Seller avatar
bonouhw Westfälische Wilhelms-Universität Münster
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
7 year
Number of followers
2
Documents
51
Last sold
6 year ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions