100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Case

Tutorial 9 - Exercises (Operations Scheduling)

Rating
-
Sold
-
Pages
8
Uploaded on
28-03-2018
Written in
2016/2017

Operations Management, Supply Chain Management

Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Institution
Study
Course

Document information

Uploaded on
March 28, 2018
File latest updated on
December 17, 2018
Number of pages
8
Written in
2016/2017
Type
Case
Professor(s)
Unknown
Grade
Unknown

Subjects

Content preview

Operations Management
9. Tutorial: Operations Scheduling – Exercises
Task 1: Order planning (one station)
The final assembly of the welding robot at RoboTec Inc. is conducted in a workshop. The
workshop produces only one welding robot job at once. Three times per month, the factory
manager gets a list of production orders from the sales manager (type of welding robot,
amount and due date). In the past, the sequence of the order processing was performed
intuitively. You are asked to optimize the schedule of the workshop. For the first ten days of
February following files were submitted:
No. Type Amount Assured Delivery Time

1 SR-01 2 02/04 – 1 pm

2 SR-01 3 02/03 – 3 pm
3 SR-02 2 02/04 – 8 pm

4 SR-02 3 02/05 – 11 am

5 SR-03 2 02/10 – 2 pm
6 SR-03 3 02/07 – 7 pm

The workshop requires the following processing times depending on the type of the robot for
the assembly:
Type Processing Time [h]
SR-01 7
SR-02 5
SR-03 10

The contracts for delivery specify penalties for late deliveries. For every late delivery a fixed
amount of 250 € is due. Additional 5 € for every complete hour of delay are incorporated as
well.
Today is February 1, 8 am. The production can start immediately. There are no set-up times
between jobs. If a job is finished, it is immediately ready for delivery (completion time =
delivery time). The daily working hours in the factory is 12h (8 am – 8 pm). If the assured
delivery time is 02/02, 2 pm, the processing time of the workshop is 18 hours (02/01: 12
hours, 02/02: 6 hours).

, a) Please illustrate the sequence of jobs graphically in a Gantt chart. Please calculate the
average completion time, the maximum tardiness, the number of delayed jobs and the costs of
tardiness, if the order of arrival determines the processing sequence.
Sequences (FCFS-Rule):
Processing Time Due Date Starting Time Completion Time Tardiness
No. [h] [h] [h] [h] [h]




Gantt-Diagram (FCFS):




2
$6.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
bonouhw

Also available in package deal

Get to know the seller

Seller avatar
bonouhw Westfälische Wilhelms-Universität Münster
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
7 year
Number of followers
2
Documents
51
Last sold
6 year ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions