Why are Monte Carlo simulations used in program schedule analysis? 10.2 - Answer- To find the cumulative effect of multiple risks on total project schedule duration or total project cost A shortage of steel has caused a delay in one of the tasks until the material is available. The original plan estimated the material to be available in 6 weeks, but the shortage continues. What would be an appropriate step in tracking and managing this issue? 15.3 - Answer- Adjust the corrective action plan and issue level as warranted. Since risks should be closely tied to individual tasks and deliverables, which of the following should be used as a cross-reference to each risk? 31.1 - Answer- Work Breakdown Structure (WBS) number The following describes which type of category of risk: Two legacy software systems must be combined into one system in order to operate a new piece of hardware. Programmers must find a way to ensure that old data records in each system are still editable. If not, the hardware will not operate correctly. 7.2 - Answer- Technical Which of the following is important for good government/contractor coordination of risk management (RM)? (Select two that apply.) 6.3 - Answer- Not: Common approaches to addressing risk. All personnel committing to plan and execute a successful risk management (RM) program Which of the following is a critical success factor to ensure effective risk management (RM)? 4.1 - Answer- Program Risk Process (PRP) Document Which stage of the issue management (IM) process is characterized by the following scenario: It has been observed that the battery used in the new portable Doppler-based wind measuring system doesn't maintain a charge for long periods of time. After some study, it is determined that the issue has only a moderate effect on the program's success. 15.1 - Answer- Not: Issue identification Which of the following is a step of the Department of Defense (DoD) Risk Management Process? 3.1 - Answer- Mitigation Whic

Show more Read less
Institution
PMT 0170
Course
PMT 0170








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PMT 0170
Course
PMT 0170

Document information

Uploaded on
December 29, 2023
Number of pages
3
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
2001
Member since
3 year
Number of followers
1444
Documents
47101
Last sold
17 hours ago

3.8

342 reviews

5
170
4
61
3
44
2
16
1
51

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions