NCCCO SIGNAL PERSON TEST – 72 QUESTIONS WITH VERIFIED SOLUTIONS.
continuously during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements if the communication is disrupted at any time while the crane is operation, the operator shall Brainpower Read More Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:06 / 0:15 Full screen osha 1926.1400 appendix a OSHA's standard method crane hand signals would be located in the following designated person according to asme b30.5 prior to qualifying all signal persons they must be tested by? none what should be the response of the operator if the signal is not understood posted conspicuously according to asme b30.5 where must a hand signal chart be posted lift director, signalman and operator when using voice signals according to asme b30.5 who must be present for the pre lift discussion limitations a qualified signal person must have knowledge of the standard hand and voice signals along with a basic understanding of crane operations and tested according to osha 1926.1419 before lifting operations begin communication systems shall be identify each other prior to commencing a crane lift the operator and signalperson shall perspective any direction given to the crane operator by the signal person shall be given from the operator function and direction what is the first element of voice signals given to a crane operator prior to the lift three according to osha and asme b30.5 each series of voice signals contain how many elements lift director for lifting operations using voice signals who has the responsibility of permitting multiple simultaneous crane functions standard signals according to asme b30.5 special signals cannot conflict with back up if the operator sounds three short audible signals while loving the crane he/she intends to stop if the operator sounds one short audible signal while moving the crane he/she intends to job site location according to asme b30.5 ant audible emergency signal must be agreed upon at each go ahead if the operator sounds two short audible signals while move crane he/she intends to hard wire radio when signaling a tower crane which of the following is most reliable asme b30.3 according to asme which volume listed below must be used to hand signal a tower crane asme b30.5 according to asme which volume listed below must be used to hand signal a mobile crane 10 feet w/encroachment precautions according to osha 1926.1408 the minimum clearance between any part of the crane and power lines rated 50kv or below shall be 10 feet w/encroachment precautions according to osha 1926.1408 for power lines rated 100kv the minimum clearance between the crane and any lines shall be 6 osha 1926.1411 when you encounter power lines with a voltage of 44kv and the crane is in transit you must keep a minimum clearance of how many feet 10 according to osha 1926.1411 when the crane is in transit and the power lines you are to go under are rated at 300kv what minimum clearance must you maintain signal person osha 1926.1401 a dedicated spotter must also have the qualifications of a utility owner/operator overheard power lines shall be considered energized authorization that the lines are deenergized must be given by whom anti two block according to osha 1926.1431 when signaling a crane that is lifting a personnel platform which device listed below must be attached to the crane
Written for
- Institution
- NCCCO Crane
- Course
- NCCCO Crane
Document information
- Uploaded on
- December 27, 2023
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Unknown
Subjects
Also available in package deal