RTE SAFe 5.0 Study Materials with Certified Solutions
RTE SAFe 5.0 Study Materials with Certified Solutions What are three ways to foster accountability on an ART? Stakeholders' presence in the System Demo; Report fact-based Metrics; Peer Pressure What two practices are most important for the ART to best support Release on Demand? Decouple deployment from release; Continuous Integration Why is the innovation pillar of the House of Lean important to SAFe? It validates Solutions with Customers Which core competency best describes the critical skills of Scrum, Kanban, and the Built-In Quality practices that are needed to manage the flow of value? Team and Technical Agility Which core competency helps foster faster lead time, faster recovery, fewer defects, and more frequent deployments? Agile Product Delivery When is the best time to conduct the pre- PI Planning event during the Innovation and Planning (IP) Iteration? As early as possible An ART has significant external dependencies on long-lead hardware items. What two actions should an RTE take to meet this constraint? Treat the Supplier like an ART; Invite the hardware manufacturers to the PI Planning event During PI Planning, an SoS is occuring just before the draft plan review. The SM of one team states that one of the Product Managers just showed up to their planning area with a priority wish list of items. The items do not align with the Feature prioritization. What is the most likely planning anti-pattern causing this sudden impediment? Prioritization by Product Management was performed autonomously not collaboratively. Which three topics are covered on the first day of the PI Planning event? Product/Solution Vision; Business Context; Architecture Vision and development practices Teams are reporting a high level of success through their individual quantitative measurements, but the system results say otherwise. What should the RTE do to help the teams deliver more value? Coach the SMs on good retrospective techniques and ensure teams are defining and taking a systems view approach to improvements During PI execution, the System Team is unclear about how to test some of the larger Features. What should an RTE do? Encourage the System Team and Product Management to meet and collaborate on a solution Which core competency describes the mindsets, culture, and practices that make flow possible? Agile Product Delivery What is the best way for the RTE to show progress of work in the current PI to management? Conduct a System Demo What are two reasons why an environment of mutal influence is desirable? It provides guardrais for decision making; It encourages transparency <- This is wrong, find right answer When facilitating an IA problem-solving workshop, which three brainstorming rules help guide the working group to explore potential corrective actions? Discourage silence; Explore and combine ideas; Be positive and open to new ideas <- This is wrong, find the right answer
Written for
- Institution
- RTE SAFe
- Course
- RTE SAFe
Document information
- Uploaded on
- December 22, 2023
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
rte safe 50 study materials with certified soluti
Also available in package deal