PJM Test Prep | 200 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 33 Pages
Which of the following balancing control modes is used by PJM under normal operations? - Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? - Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability - Dynamic Instability If PJM experienced an event that caused the loss of a 1,000 MW generator, which of the following would most likely provide the quickest impact to improve the undegenerating Area Control Area (ACE)? 1. Remedial Action Reserve 2. Synch Reserve 3. Non-Synch Reserve 4. Secondary Reserve - Synch Reserve Your system has experienced an event that caused the frequency to drop below 60.00 Hz, what would be the most likely event that occurred? - A generator on your system tripped offline
Written for
- Institution
- PJM
- Course
- PJM
Document information
- Uploaded on
- December 13, 2023
- Number of pages
- 33
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm test prep 200 questions with 100 correct an
Also available in package deal