ACI Concrete Strength Testing Technician CP-19 (14) 80 Questions with 100% Correct Answers | Verified | Latest Update 2024
These procedures for capping enable concrete cylinders and cores to meet the standard's requirements for ________ and _________. - Planeness, perpendicularity Equipment needed for the capping process includes capping _____ , _____devices, and ______ pots. - Plates, alignment, melting Plates for neat cement and high strength gypsum plaster caps should be made of _____, _____, _____ or _____. - Glass, metal granite or diabase Sulfur mortar cap plates should be formed against _____ or _____ plates. - Metal, Stone The purpose of the guide bar or bull's eye level is to ensure that caps remain perpendicular to the axis of the cylinder within 0.5 degrees. True or False? - True To avoid accidents during reheating of cooled sulfur, use melting pots that have _____. - Peripheral heating The technician should use a stiff layer of _____ to cap fresh concrete cylinders. - Neat cement paste Hardened concrete cylinders should be capped with _____, _____ or _____. - High-strength gypsum paste, neat cement paste, or sulfur mortar
Written for
- Institution
- ACI Concrete Strength Testing Technician CP-19
- Course
- ACI Concrete Strength Testing Technician CP-19
Document information
- Uploaded on
- December 13, 2023
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci concrete strength testing technician cp 19 14
Also available in package deal