ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) 160 Questions with 100% Correct Answers | Verified | Latest Update 2024
The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. - 3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________. - 1 degree, 30 degrees to 120 degrees The temperature measuring device shall be calibrated ______ , or whenever there is a question of ______ . - Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - True The temperature of concrete may be measured in a wall form. True or False? - True What must be done to the sample container prior to sampling the concrete? - Dampen with water What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete? - Close off air voids by gently pressing the concrete around the device How long must the temperature measuring device remain in the freshly mixed concrete? - minimum of two minutes, maximum of five minutes The temperature of the concrete is reported to the nearest ______ °F - 1 degree
Written for
- Institution
- ACI Certification- Concrete Field Testing Technici
- Course
- ACI Certification- Concrete Field Testing Technici
Document information
- Uploaded on
- December 13, 2023
- Number of pages
- 16
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci certification concrete field testing technici
Also available in package deal