NERC RC BAL-001 questions with correct answers
System Frequency Rule of Thumb CORRECT ANSWER 1% change in frequency leads to 2% change in MW load Each BA shall operate resources to provide for a level of operating reserve sufficient to account for? CORRECT ANSWER Frequency Support Errors in load forecasting generation loss transmission unavailability regulating requirements What is 'Sufficient Operating Reserves' ? CORRECT ANSWER Capacity required to meet the CPS & DCS 'Operating Reserve' CORRECT ANSWER Capability above Firm Demand required to provide for regulation, load forecasting error, equipment forced & scheduled outages & local area protection Define 'Operating Reserve- Spinning' CORRECT ANSWER Gen. synchronized to the system & fully available to serve load within the Disturbance Recovery Period following the contingency. Load fully removable from the system within the Disturbance Recovery Period following the Contingency
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- December 8, 2023
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nerc rc bal 001 questions with correct answers
Also available in package deal