100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

My NERC questions with correct answers

Rating
-
Sold
-
Pages
22
Grade
A+
Uploaded on
08-12-2023
Written in
2023/2024

A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation plans? CORRECT ANSWER D. Regional Reliability Organization for the area. The transmission operator that you work for is installing new relays on some of their major transmission tie lines using newer technology. Who should your company notify before work is begun? CORRECT ANSWER C. Neighboring Transmission Operators, Balancing authorities, and Generator Operators. When shall the transmission Operators and balancing authorities review and update emergency plans? CORRECT ANSWER A. Annually When the responsible entity tags a dynamic schedule, what values should it use for the energy profile? CORRECT ANSWER Expected average MW profile for each hour. You are reliability coordinator in the eastern interconnection. Transmission Operator AB is in your Reliability Area. Transmission Operator AB reports that a 600 MW generator that tripped offline has caused an overload of a 345/138/13KV Inter-tie Transformer Bank. You realize that if the overloaded transformer trips off line, it would create an IROL. There are several Interchange Transactions that have parallel flows that are flowing through that transformer. What should you do? CORRECT ANSWER D. Issue a TLR on enough interchange transactions starting with the lowest priority and working up, until enough are curtailed to relieve the transformer from its overload condition.

Show more Read less
Institution
NERC
Course
NERC










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC
Course
NERC

Document information

Uploaded on
December 8, 2023
Number of pages
22
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker Chamberlain School Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2003
Member since
3 year
Number of followers
1342
Documents
46733
Last sold
2 hours ago
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

366 reviews

5
162
4
84
3
49
2
22
1
49

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions