Practice questions for the NERC exam with correct answers
b. NERC Operating Committee CORRECT ANSWER What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment CORRECT ANSWER What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equipment d. Notify their PSE that the transmission path is out of service c. Tie Lines CORRECT ANSWER For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency calculations, and all ________ must be metered. a. Communications b. Transformers c. Tie Lines d. Generation c. Energy Emergency Alert Level I CORRECT ANSWER What Energy Alert Level would the following example be categorized as?
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- December 8, 2023
- Number of pages
- 21
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
practice questions for the nerc exam with correct
Also available in package deal