100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PROCORE PROJECT MGMT.-66 QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
05-12-2023
Written in
2023/2024

true or false if you have a project with more than one building or area you should enable the drawings by area feature. true true or false it's important to discuss best practices in formatting your drawings with the design team to ensure that the drawings are seamlessly processed in Pro core. true Brainpower Read More true or false when you click a projects drawings tool you should expect to see the Project's current set of drawings. Example the most recently uploaded version of each drawing. true square triangle icon next to a drawing means markups have been added to the drawing if you see the SK icon next to a drawing what does it mean The drawing has sketches associated with it how can you draw a straight line while marking up your drawing? hold the shift key while drawing the line who can view drawing markups on your personal layer? only you true or false when you add a mark-up to a drawing any more cups will be immediately available to your team without further action on your part false true or false you can now have your design team upload drawings directly to the drawings tool without having the drawings be published immediately. true you should upload shop drawings to procuras drawings tool false true or false procore automatically send an email to users with admin permissions on the drawings tool when new drawings have been uploaded and are ready to be reviewed and published true what is an important best practice you should communicate to the design team about the formatting of the spec book? all of the above true or false before you publish your spec book to the team you should make sure there is a break between every spec section. true true or false to upload a revision to your spec book you will first need to delete the old version from procore false why are some action buttons inactive and gray? because certain actions require that you first select one or more spec sections before the button becomes active in Orange true or false when you delete a specification from the specifications list page you will delete the specification and all of its revisions false in Pro core what does it mean if a field has a blue carrot in the top corner of the cell? the field is editable in line which action are you unable to perform from the PDF viewer of a spec section? export as a CSV file true or false you can only access and view the project spec book in the specifications tool false true or false your field team should have access to specifications in the specifications tool true who should be set up as subscribers to the specifications tool everyone on the project field team if you would like to allow your external subcontractors to submit their submittals in procore without giving them full access to the tool which permission level should you assign them standard true or false when you delete a submittal in procore it is permanently deleted and unrecoverable false true or false when you save a submittal as a draft no notifications are sent out to the members of the distribution list and workflow true what is the submittal manager a user who is the gatekeeper of the submittal and is in charge of facilitating a submittals workflow making sure that it is collected and reviewed by all appropriate people. what happens when the ball in court on a submittal switches to you? all of the above

Show more Read less
Institution
Project Management Procore Certification
Course
Project Management Procore Certification









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Project Management Procore Certification
Course
Project Management Procore Certification

Document information

Uploaded on
December 5, 2023
Number of pages
7
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BRAINBOOSTERS Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
659
Member since
2 year
Number of followers
250
Documents
22740
Last sold
16 hours ago

In this page you will find all documents , flashcards and package deals offered by seller BRAINBOOSTERS

4.5

340 reviews

5
265
4
30
3
21
2
5
1
19

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions