For hot work operation with citywide permit, the owner of the premises of the hot work operation
areas must be notified in writing by the citywide permit holder ______ the hot work is to be
started. - ANSat least 48 hours before
The pre-hot work check must be conducted by the responsible person before hot work is
authorized and __________ - ANSleast once per day.
The check reports must be kept at the work site during the work, made available for inspection
by a representative of the FDNY, and maintained on the premises for a minimum of - ANS48
hours after work is complete.
A pre-hot work check must be conducted at least - ANSonce per day
Hot work operations involving cutting or welding shall be conducted at least - ANS35 feet from
combustible materials and combustible waste
All other hot work operations shall be conducted at least - ANS25 feet from combustible
materials and combustible waste
Sprinkler system protection ____________while hot work is performed. - ANSmust not be shut
off or impaired
When should a Fire watch be maintained - ANSA fire watch must be maintained during any hot
work operation.
What other duties should the Fire Watch have while on hot water operations. - ANSThe persons
conducting a fire watch shall not have other duties.
Where hose lines are required, they shall be connected, charged and ready for operation -
ANSAt least one portable fire extinguisher with a minimum 2-A:20-B:C
How far away should one fire extinguisher be from any operation - ANS30 feet
The fire watch for torch operations conducted at the following three locations shall be conducted
by at least one F-60 fire guard - ANS(1)Construction sites.
(2)In any building or structure, when the torch operation is conducted by a person holding a
citywide permit for torch operations.
(3)On any rooftop, or in connection with any torch-applied roofing system operation.