C-10 Electrical Exam Questions with Complete Solutions, Latest Update
1. Takeoffs of conduit are categorized into ______. - Answer-Power distribution, branch lighting, and branch power 2. Raceways are taken off per _____. Fittings required to make turns and extensions are taking off per _____. - Answer-Linear foot, each 3. All wires and conductors are taken off per _____. - Answer-Linear foot 4. All fittings, devices and boxes are taken off per _____. - Answer-Each Item 5. Permits and fees for tie-ins may be listed at lump sum and are taken off per _____. - Answer-Occurrence,Project, and Contract 6. Control stations are taken off by _______. - Answer-Individual Unit and Each Item. 7. Panelboards are taken off individually according to ______. - Answer-Type, Size, and Voltage 8. Starters, safety switches and fuses are taken off per _______. - Answer-Each Item 9. _______ should be kept separate from general light fixtures. - Answer-Exit Lighting 10. Interior and exterior lighting should be taken off and listed _______. - Answer-Separately 11. Lamps for light fixtures are _______. - Answer-Taken off per each Item 12. Light fixtures should be listed in the takeoff according to _______. - Answer-Color 13. Working electrical drawings numbered sequentially, prefaced by the letter "E", include _______. - Answer-Telecommunications and security systems only 14. The _______ shows power requirements of the structure. - Answer-Power plan 15. The _______ aids the electrical contractor sizing the panel. - Answer-Panel Schedule 16. The _______ plan is supplemented by the fixture schedule. - Answer-Lighting 17. The fixture schedule lists lamp _______. - Answer-Wattage 18. Electrical specifications provide _______. - Answer-The grade of materials to be used, Materials installation specifics, and how materials will be used in the finished system
Written for
- Institution
- C-10 Electrical
- Course
- C-10 Electrical
Document information
- Uploaded on
- November 25, 2023
- Number of pages
- 13
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- c 10 electrical
-
takeoffs of conduit are categorized into
-
all wires and conductors are taken off per
-
permits and fees for tie ins may be listed at lump