Asbestos Project Monitor Examination Questions Answered Correctly| Already Passed
Asbestos Project Monitor Examination Questions Answered Correctly| Already Passed What is Surfactant? - ANSWER A chemical that reduces the surface tension of water Class 1 Asbestos Project - ANSWER Removal of TSI & Surfacing How do you find the Maximum Use of Concentration? MUC/MUL - ANSWER PEL x PF = MUC What is the sequence for Phase 2 work area preparation? - ANSWER 1. Set up signs 2.Build the worker Decon unit 3.Preparation of the regulated abatement work area 4. (NYS only) wait 4 hours What is the order of the Decon room from the work area out ? - ANSWER Equipment room(dirty room) Airlock Shower Airlock Clean room What does NESHAP prohibits? - ANSWER Prohibits visible emission and Prohibits any dry removal of ACM Who needs to be on site for a Class 1 or Class 2 Asbestos project ? - ANSWER OSHA Competent Person Supervisor & Handlers What is the OSHA Respirator standard? - ANSWER 29 CFR 1910 134 What kind of projects need to be notified to the EPA? - ANSWER All friable projects where the removal or disturbance of asbestos will be greater than or equal to 260 Linear ft, 160 square Ft, 35 cubic feet. EPA will be notified 10 business days in advance What color is Tremolite? - ANSWER Green What is the maximum length of the duct in the Negative Air Filtration System ? - ANSWER Maximum 25 Feet Energized conduits that couldn't be shut off for Health and Safety reasons, how are they to be covered ? - ANSWER 3 independent layers of 6 mil fire retardant poly How many filters are in a negative air filtration system ? - ANSWER 3 Filters What mandates the use of supplied air respirator ? - ANSWER Oxygen deficiency & unknown contaminants How many times an hour does OSHA regulation require the air to be changed ? - ANSWER 4 times an hour or at least once every 15 minutes What color is Crocidolite ? - ANSWER Blue What is ACM ? - ANSWER Any material that is greater than 1% When a solid barrier is in place, what's the dimension of the opening ? - ANSWER Greater than 32 Square feet What is NOT consider as a critical barrier ? - ANSWER Sprinkler When do you become apart of the Medical Surveillance Program ? - ANSWER When the employee are exposed at the PEL for 30 days in the last 360 Days How many parts are the ACBM broken up into and what are they ? - ANSWER 3 Surfacing TSI (Thermal System Insulation) Misc. Materials What is going to be used to wet ACM? - ANSWER Amended water What is being checked during a Fit Check ? - ANSWER Positive and Negative Pressure When is a fit check performed ? - ANSWER Every time the respirator is donned For an opening greater than 32 square feet, what kind of barrier is in place ? - ANSWER Solid barrier What is HEPA? - ANSWER High Efficiency Particulate Air 99.97% efficient at filtering particulates greater than or equal to .3 microns Which type of Asbestos is the most difficult to wet and what color is it ? - ANSWER Amosite and Brown What kind of ACM will be removed using a single glove bag? - ANSWER Pipe insulation What is the 8 hour TWA for PEL? - ANSWER 0.1 F/CC What is the last piece of protective equipment to be removed ? - ANSWER Respirator What are the two types of fit testing ? - ANSWER Quantitative and Qualitative. Which is the better method of fit testing ? - ANSWER Quantitative What are the three filters that's NIOSH approves? - ANSWER P100 N100 R100 What is the safe level to asbestos exposure ? - ANSWER No safe level to exposur
Written for
- Institution
- Asbestos Project Monitor Ex
- Course
- Asbestos Project Monitor Ex
Document information
- Uploaded on
- November 24, 2023
- Number of pages
- 13
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
asbestos project monitor examination question
-
asbestos project monitor examination questions an
Also available in package deal