100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CTQP Final Estimates Level 1 Questions and Answers(A+ Solution guide)

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
19-11-2023
Written in
2023/2024

1) A major function of the DOT is to carry out Construction and Reconstruction programs to provide the public with adequate transportation service. - Answer True For the DOT, the management of Construction and reconstruction projects involves the following specific responsibilities: A. Planning, Programming and design B. Contract administration C. Contractor payments D. Design and Contract Management E. All of the above - Answer E. All of the above 3) To pay for the work performed by Contractors, progress and Final Estimates are needed. True or False? - Answer True DESIGN STANDARDS - Answer These standards are made available for Design, Construction, Maintenance, and Utility operations on the State Highway System. This booklet provides guidelines and technical drawings for design and Construction personnel. SUPPLEMENTAL AGREEMENTS (SA) - Answer SA'S are work of a different characteristic from that shown in the original plans and contract; such as to clarify the Specifications, or pay for unforeseen work. WORK ORDERS (WO) - Answer WO's are similar to SA's but can't be used in all instances. They are used to include additional work into the original contract, and to do minor changes. JOINT PARTICIPATION AGREEMENTS (JPA) - Answer JPA's or Locally Funded Agreements (LFA)'s are part of the State Contract with a separate Financial ID Number. They are legal documents between the Department and other government or private entities. The work would be a utility relocations or installations, etc. 1) Multiple choice. Which of the following is NOT officially considered to be a "Contract Document"?A. Supplemental Agreements and Work Orders. B. Notebooks and Estimates Procedure Manual. C. Standard Specifications. D. Construction Manual. E. Answers B &D - Answer E. Answer B & D 2) Multiple choice. Between printings of the Standard Specifications, what does the Department publish to identify and describe changes in the Specifications? A. CPAM B. Supplemental Specifications C. Work orders D. Specifications Changes - Answer B Supplemental Specifications

Show more Read less
Institution
CTQP
Course
CTQP









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CTQP
Course
CTQP

Document information

Uploaded on
November 19, 2023
Number of pages
9
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainarium Delaware State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1826
Member since
2 year
Number of followers
1043
Documents
22338
Last sold
3 days ago

3.8

317 reviews

5
147
4
60
3
54
2
16
1
40

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions