SPēD SAPPC: PHYSEC 2024 (100% Verified Answers)
B. It must be in an area designated as a Restricted Area correct answers When designing a new multi-story government Special Access Program Facility (SAPF), the architect provided identical drawings for two three-story buildings to the security officer. One drawing is for a building on the installation to be occupied only by contracting Company X. The other is for the command headquarters building on the installation.The design reveals floor-to-ceiling windows on the second floor for the main conference rooms and front office staff. The drawings indicate a parking lot adjacent to the building separated by a four-foot-wide, handicap-accessible sidewalk. The architect placed emergency exits and stairwells at each end of the building with door hardware on the exterior to facilitate access/egress. The floor plans show interior office and conference room doors with GSA-approved locks and connectivity to the building access control badge system. The front door drawings indicate a large safety glass key lock entry door with the unit logo and designation etched in True correct answers True or False. Hinge pins that are located on the exterior side of emergency exit doors in the SAPF must be spot welded or have set screws installed to prevent removal of the door. C. Bollard or berm correct answers Which of the following man-made barriers could be an appropriate measure to impede vehicle passage between the parking lot and the building? A. Bollard or chain link fence B. Berm or moat C. Bollard or berm D. Berm or chain link fence The five steps in the DoD risk management model correct answers 1. Assess Assets 2. Assess Threats 3. Assess Vulnerabilities 4. Assess Risks 5. Determine Countermeasures Three core components of the risk assessment process correct answers 1. Asset criticality 2. Threat assessment 3. Vulnerability assessment Physical security survey correct answers A formal, recorded assessment of an installation's overall security program Physical security inspection correct answers A formal, recorded compliance of physical procedures and measures implemented by a unit or activity to protect its assets
Written for
- Institution
- SPēD SAPPC: PHYSEC
- Course
- SPēD SAPPC: PHYSEC
Document information
- Uploaded on
- November 2, 2023
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
b it must be in an area designated as a restricte
Also available in package deal