CAHIMS 6.2 Verified Solution Update
CAHIMS 6.2 Verified Solution Update All of the following should be considered in selection of the pilot group EXCEPT: a. Advice of the steering committee. b. Representativeness of a cross-section of the user community. c. Readiness for the technology. d. Age. - ANS-D What is an appropriate length of time for staff education and training before system implementation? a. Two hours b. Two days c. Two weeks d. Two months e. Two years - ANS-C The most appropriate training strategy is: a. Classroom-style. b. Web-based. c. One-on-one. d. Train the trainer. e. All of the above. - ANS-E Survey data from the pilot users should include all of the following EXCEPT: a. What changed? b. What went wrong? c. What are suggestions for interface changes? d. Would you like to go back to the old system? - ANS-D The success of the implementation and roll-out is most evidenced by the: Continues...
Written for
- Institution
- CAHIMS 6.2
- Course
- CAHIMS 6.2
Document information
- Uploaded on
- October 22, 2023
- Number of pages
- 1
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- cahims 62
- survey dat
-
cahims 62 verified solution update
-
all of the following should be considered in selec
-
what is an appropriate length of time for staff ed
-
the most appropriate training strategy is
Also available in package deal