CAC exam review questions and answers updated | complete solution
CAC exam review questions and answers updated | complete solution When is the building inspectors report due to the management planner? - 30 days after completion of survey Responsible for completing Functional space report - The building inspector AHERA reinspection of the facility - Every 3 years AHERA periodic surveillance - Every 6 months Important components when writing contract documents - Scope of work Description of work Lines of communication Term legal wrong - Tort Substance would not be used in a qualitative fit test - DEHS AHERA required identification of all ACBM in a school - False How long are exposure records maintained - 30 years Who must be notified in writing if employer that maintains ER goes out of business - NIOSH Employee may get a copy of the exam results from - The physician Asbestos construction standard - 29 CFR 1926.1101 Regulations NOT promulgated by the EPA - Respiratory protection standard OSHA & CAL OSHA definition of PACM - Surfacing or thermal system insulation material found in a building constructed prior to 1980 According to OSHA asbestos standard, all products with asbestos must be labeled - False Reviewing drawings before a survey, what does the inspector use to understand abbreviations - Schedules Required types of notifications for a contracted janitorial service in a building with ACM - 2 hour training session Elevation definition - Drawings of a building as viewed horizontally from the outside Plans definition - Drawings of the building as viewed from above Flow rate conversation calculations - Actual flow rate x pressure calibrated/pressure actual Calibration of air sampling pump - Rotameter, cassette, pump Max allowable concentration of carbon monoxide in grade D air - 20 ppm Narrowest base dimension on scaffold - At least one half the height Dry removal of asbestos is never allowed - False More appropriate for bridging encapsulant - Damaged pipe elbows Negative air machines calculation - A=Volume (LxWxH) divided by 15 (change 4x/hr) then divide by machine capacity Appropriate way to handle fireproofing loose debris - Trough with poly sheeting and pvc frame to catch debris and lower to ground When are work area danger signs posted - During work area preparation Black mastic removal - OSHA identifies work with construction mastic as class II operation Following regulations that defines ACCM/contains more than 0.1% asbestos - CAL OSHA asbestos construction standard Landfill requirements for burial of ACM - Covered with at least 6 inches of compacted soil within 24 hrs of placement Most appropriate way to get air out of asbestos bags - Before sealing, use HEPA vacuum to remove extra air, then goose neck bag Maintaining records - A requirement, not an option Medical surveillance records - 30 yrs after last day of employment Training records - 1 yr after expiration
Written for
- Institution
- CAC
- Course
- CAC
Document information
- Uploaded on
- October 21, 2023
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cac exam review questions and answers updated co